REINFORCEMENT METHOD OF PILE FOUNDATION OF POWER TRANSMISSION LINE SUPPORT ON WEAK BASE Russian patent published in 2010 - IPC E02D27/12 

Abstract RU 2380486 C1

FIELD: construction industry.

SUBSTANCE: reinforcement method of pile foundation of power transmission line support on weak base provides for reinforced zone made around pile and under its edge in soil mass by boring the boring tool into soil mass without bringing bored soil to the surface to the depth exceeding depth of pile location, with further rotation of screw boring tool in reverse direction with simultaneous application of axial force directed downwards, the value of which is accepted as equal to the specified value of design resistance of compacted soil. During rotation of screw boring tool in reverse direction, additional volume of soil and/or strengthening disperse and bonding material or expanding material, for example foamed polyurethane, is introduced to reinforced zone.

EFFECT: simplifying reinforcement procedure of pile foundation of power transmission line support, increasing efficiency and reliability, reducing labour input and material consumption.

1 dwg

Similar patents RU2380486C1

Title Year Author Number
METHOD FOR PROTECTING THE BEARING SUPPORT STRUCTURE OF ABOVE-GROUND MAIN PIPELINE FROM THE IMPACT OF THE FORCES OF FROSTY HEAVING OF SOIL 2022
  • Shammazov Ildar Airatovich
  • Sidorkin Dmitrii Ivanovich
  • Batyrov Artur Magomedovich
RU2785329C1
METHOD OF SOIL REINFORCEMENT 2012
  • Jakushenko Sergej Vasil'Evich
RU2513954C2
INSTALLATION METHOD OF PILE OF OPEN PROFILE IN WEAK SEASONALLY FROZEN HEAVING SOILS 2008
  • Ol'Shanskij Vladimir Germanovich
  • Ostroborodov Sergej Vasil'Evich
  • Shevtsov Konstantin Pavlovich
RU2394127C2
METHOD FOR ERECTION OF PILE OR POST IN LOOSE OR UNSTABLE GROUND 1996
  • Indjukov Aleksandr Trofimovich
  • Shevtsov Konstantin Pavlovich
  • Ljazgin Anatolij Leonidovich
  • Ol'Shanskij Vladimir Germanovich
  • Ostroborodov Sergej Vasil'Evich
  • Zanjatin Sergej Ivanovich
  • Chisnik Sergej Anatol'Evich
  • Kislov Boris Ivanovich
RU2117106C1
ERECTION METHOD OF DRIVEN PILE 2014
  • Mal'Tsev Nikolaj Vasil'Evich
RU2560027C1
METHOD OF PILE DRIVE DEVICE 2014
  • Krutov Vladimir Ivanovich
  • Kovalev Aleksandr Semenovich
  • Kovalev Vladimir Aleksandrovich
RU2601630C2
METHOD FOR CONSOLIDATING SAGGING SOIL UNDER GRAVITY AND WEIGHT OF ERECTED BUILDING 0
  • Zavorotnij Anatolij Fedorovich
  • Kuklev Vyacheslav Aleksandrovich
  • Maksimenko Georgij Tarasovich
SU1110872A1
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION 2016
  • Yurkevich Pavel Borisovich
RU2657885C2
METHOD OF CONSOLIDATING SAGGING SOIL BODY 0
  • Musaelyan Aleksandr Arkadevich
  • Popsuenko Ivan Konstantinovich
SU996620A1
PILE IN THE PUNCHED WELL ARRANGEMENT METHOD (EMBODIMENTS) 2017
  • Krutov Vladimir Ivanovich
  • Kovalev Aleksandr Semenovich
  • Kovalev Vladimir Aleksandrovich
RU2663420C1

RU 2 380 486 C1

Authors

Ol'Shanskij Vladimir Germanovich

Ostroborodov Sergej Vasil'Evich

Khromyshev Nikolaj Konstantinovich

Shevtsov Konstantin Pavlovich

Dates

2010-01-27Published

2008-06-20Filed