FIELD: construction.
SUBSTANCE: method includes treatment of structures by means of irrigation with aqueous solution of reagent. Building demolition is carried out with application of dust suppression. Prior to building damage a pit mortuary is arranged nearby, and a transporting trench is provided. Trench binds damaged building and pit mortuary. Damage of building is executed top down to the depth of foundation embedment by means of selective microexplosions. Large fragments are removed from damaged building. Construction wastes accumulated in process of damage are transported along trench into pit mortuary. At the same time serial reagent treatment of mass flow is carried out at the entry into trench and exit from trench into pit mortuary by solution of flocculants. Solution of flocculants contains anode and cathode groups of polymer macromolecules.
EFFECT: improved safety, provision of environmental safety of works, reduction of material expenses, time of demolition and burial of building.
5 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RECULTIVATION OF OBJECTS PROVIDING NEGATIVE EFFECTS ON ENVIRONMENT | 2017 |
|
RU2633397C1 |
METHOD FOR STORAGE AND BURIAL OF RADIOACTIVE WASTES (ALTERNATIVES) | 2002 |
|
RU2222840C1 |
METHOD FOR COMPLEX PROCESSING OF MIXED SOLID WASTE | 2022 |
|
RU2772178C1 |
METHOD OF DETOXIFICATION OF DESTROYED INDUSTRIAL BUILDING FRAGMENTS POLLUTED WITH LEWISITE AND CONVERSION PRODUCTS THEREOF | 2004 |
|
RU2299100C2 |
WELL CONSTRUCTION METHOD | 2006 |
|
RU2320847C1 |
TOXIC AND NUCLEAR WASTE DISPOSAL | 2012 |
|
RU2515578C1 |
METHOD FOR STORAGE OF IRRADIATED NUCLEAR FUEL (ALTERNATIVES) | 2002 |
|
RU2222841C1 |
METHOD OF CONSTRUCTION AND ELIMINATION OF THE EARTH STORAGES-COLLECTORS | 2002 |
|
RU2291180C2 |
METHOD FOR CONSTRUCTING SLUDGE STORAGE PIT FOR WELL CUTTINGS AT OIL AND GAS DEPOSITS (VERSIONS) | 2014 |
|
RU2558834C1 |
METHOD OF DRILL CUTTINGS DISPOSAL IN TRENCH RESERVOIR | 2014 |
|
RU2588644C2 |
Authors
Dates
2010-06-27—Published
2009-05-20—Filed