FIELD: oil and gas industry.
SUBSTANCE: device for replacement of gates during the repair of wellhead equipment includes housing with two fixed composite screws, two composite rods and one hollow locating stock with packer stock arranged in it. Locating stock is provided with possibility of its vertical movement in central hole of the housing. At that, screws, rods and locating stock are installed in traverses arranged at various height points relative to the housing. On one end of the locating stock there arranged is packer element for covering the X-mas tree shaft, which consists of sealing collars and a nut, on the other end - packer stock with a base, which is engaged with compression drive of sealing collars of packer element. At that, base of the locating stock transmits the force from pressure of well environment to the traverse restricted against being moved with two nuts arranged on composite leading screws. Composite leading screws and composite rods are arranged on the supports consisting of several brackets.
EFFECT: providing the possibility of simultaneous replacement of master gates under pressure without well kill operation.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SIMULTANEOUS DISPLACEMENT OF HEAD VALVES OF PRODUCTION TREE UNDER PRESSURE | 2009 |
|
RU2405910C1 |
DEVICE FOR REPLACEMENT OF GATES UNDER PRESSURE | 2015 |
|
RU2590698C1 |
METHOD OF TRANSFER OF GAS AND GAS CONDENSATE WELLS, INCLUDING FLOODED ONES, FOR OPERATION ALONG TWO LIFTING COLUMNS, METHOD OF SUCH WELLS OPERATION AND DEVICE FOR IMPLEMENTATION OF SUCH METHODS | 2019 |
|
RU2739273C2 |
DEVICE FOR CHANGING FAULTY ELEMENTS OF MAIN VALVES ON THE SIDE BRANCHES OF PIPE HEADS WITH SUBSEQUENT SEALING | 2023 |
|
RU2807425C1 |
DEVICE FOR CHANGING OF CHRISTMAS-TREE GATE VALVES UNDER PRESSURE | 1999 |
|
RU2149979C1 |
X-MAS TREE PROTECTOR | 2024 |
|
RU2823364C1 |
DEVICE FOR PRESSURE TESTING TUBING TEST X-MAS TREE | 2002 |
|
RU2236552C2 |
DEVICE FOR REPLACING VALVES OF FOUNTAIN REINFORCEMENT UNDER PRESSURE | 2002 |
|
RU2232868C2 |
WELL CONVERSION METHOD, INCLUDING FLOODED WELLS, FOR OPERATION WITH TWO PRODUCTION STRINGS AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2523270C1 |
METHOD OF PRESSURE TESTING OF WELL HEAD ACCESSORY IN WELL | 2008 |
|
RU2366797C1 |
Authors
Dates
2010-09-20—Published
2009-06-15—Filed