FIELD: construction.
SUBSTANCE: invention refers to construction of tunnels, in particular - to construction of subway stations. Columned triple-arched subway station without side platforms, including middle hall with passenger platforms, side tunnels of running diameter opened at the side of middle hall, without passenger platforms, with walls-columns separated with openings, pitch of which equals pitch of doors arrangement in wagons of train. Side tunnels are arranged of unclamped prefabricated reinforced concrete rings of standard width, including upper and lower metal figure tubings within the limits of ring dimensions, having triangular slot in the middle part for the whole width of ring and joined via hinged devices with upper and lower reinforced concrete runs, which are rigidly joined to reinforced concrete walls-columns. On the back of figure tubing there are holes provided to fix steel support for end journals of upper and reverse arches of the middle hall of station in process of its erection.
EFFECT: reduced labour intensiveness and faster rates of construction.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTING UNDERGROUND STATION USING CLOSED METHOD OF CARRYING OUT WORK ON EXISTING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2810984C1 |
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL | 2018 |
|
RU2692518C1 |
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) | 2012 |
|
RU2510444C2 |
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2704414C1 |
THREE-VAULT METRO STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2019 |
|
RU2715493C1 |
THREE-ARCH UNDERGROUND STATION OF THE CLOSED COLUMN-TYPE | 2022 |
|
RU2802893C1 |
METHOD OF CONSTRUCTING SUBWAY PYLON STATION USING CLOSED METHOD OF PERFORMING WORKS ON OPERATING SUBWAY LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2824544C1 |
METHOD FOR CONSTRUCTING METRO STATION FROM PREFABRICATED ELEMENTS USING CLOSED METHOD OF PERFORMING WORK ON EXISTING METRO LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2815900C1 |
METHOD FOR ERECTION OF THREE-VAULT SUBWAY STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2020 |
|
RU2729474C1 |
THREE-ARCHED UNDERGROUND STATION OF THE CLOSED METHOD FOR THE PYLON-TYPE WORKS PERFORMANCE | 2022 |
|
RU2795446C1 |
Authors
Dates
2011-01-27—Published
2009-11-02—Filed