METHOD FOR CONSTRUCTING METRO STATION FROM PREFABRICATED ELEMENTS USING CLOSED METHOD OF PERFORMING WORK ON EXISTING METRO LINE WITHOUT INTERRUPTING TRAIN TRAFFIC Russian patent published in 2024 - IPC E02D29/00 

Abstract RU 2815900 C1

FIELD: underground construction.

SUBSTANCE: used in the construction of metro running stations between operating stations on an existing metro line without interrupting train traffic. A method for constructing a metro station from prefabricated elements using a closed method for carrying out work on an existing metro line without interrupting train traffic includes the construction of a middle station tunnel between two operating running tunnels, connecting the middle station tunnel, constructed from prefabricated elements, with running tunnels without interrupting train traffic, and forming a station deep metro. In the middle station tunnel, a passenger platform is constructed with technical premises located underneath it, between the middle station tunnel and the running tunnels, openings are constructed for the passage of passengers, and the running tunnels within the metro station are converted into side station tunnels. The middle station tunnel is made of two runs with a lining of prefabricated elements; between the middle station tunnel and the side tunnels, galleries are formed within the station along the existing running tunnels, having a monolithic reinforced concrete arch and a tray slab. In the side station tunnels, on the side of the galleries, monolithic reinforced concrete walls are constructed, while the upper arches and tray slabs of the gallery lining are supported by supporting shaped blocks located at the ends of the column-run complexes and installed during the installation of the lining of the middle station tunnel, and the reinforced concrete walls of the side tunnels. Between the galleries and the side station tunnels, openings for the passage of passengers are constructed, made in the monolithic reinforced concrete walls of the side tunnels, in which sliding doors are installed on the side of the side tunnels, and the construction of a two-run middle station tunnel, galleries and column-run complexes forms a deep column metro station.

EFFECT: ensuring the possibility of constructing a column station on an operated section of the metro line, reducing the volume and timing of construction work, minimal dismantling of existing building structures, and reducing the consumption of finishing materials during the construction of a metro station.

1 cl, 2 dwg

Similar patents RU2815900C1

Title Year Author Number
METHOD FOR CONSTRUCTING UNDERGROUND STATION USING CLOSED METHOD OF CARRYING OUT WORK ON EXISTING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC 2023
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Fadeeva Vera Borisovna
RU2810984C1
COLUMNED TRIPLE-ARCHED SUBWAY STATION WITHOUT SIDE PLATFORMS 2009
  • Timofeev Oleg Vladimirovich
  • Demenkov Petr Alekseevich
RU2410495C1
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL 2018
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Donenko Ekaterina Evgenevna
RU2692518C1
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS 2022
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
  • Donenko Ekaterina Evgenevna
RU2779168C1
THREE-SPAN METRO STATION CONSTRUCTED IN ACCORDANCE WITH THE OPEN BUILDING METHOD WITH AN ISLAND PASSENGER PLATFORM AND SINGLE-TRACK RUNNING TUNNELS 2019
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
  • Fadeeva Vera Borisovna
  • Donenko Ekaterina Evgenevna
RU2746610C1
DOUBLE-VAULTED PYLON SUBWAY STATION, CONSTRUCTED BY TRENCHLESS METHOD 2019
  • Zakharov Georgij Rafaelevich
  • Tyushevskaya Lidiya Valentinovna
  • Fadeeva Vera Borisovna
RU2735506C1
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL 2019
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
RU2704414C1
THREE-VAULT METRO STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS 2019
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
RU2715493C1
METHOD FOR CREATING UPPER CROSS-CUT ABUTTING JOINT OF APPROACH TUNNEL TO EXISTING METROPOLITAN PILOT STATION CONSTRUCTED WITHOUT INTERRUPTION OF STATION OPERATION 2020
  • Zakharov Georgij Rafaelevich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
  • Fadeeva Vera Borisovna
RU2745310C1
THREE-ARCHED UNDERGROUND STATION OF THE CLOSED METHOD FOR THE PYLON-TYPE WORKS PERFORMANCE 2022
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Fadeeva Vera Borisovna
RU2795446C1

RU 2 815 900 C1

Authors

Zakharov Georgij Rafaelevich

Maslak Vladimir Aleksandrovich

Ryabkov Stanislav Valerevich

Dates

2024-03-25Published

2023-08-22Filed