FIELD: underground construction.
SUBSTANCE: invention can be used in construction of a metro station on a stretch between operated stations on an operating metro line without interrupting train traffic. Method of constructing a metro pylon station using a closed method of performing works on an operating metro line without interrupting train traffic includes construction of middle station tunnel between two operating tunnels, connection of the middle station tunnel, which is constructed from prefabricated elements, with railway tunnels without interruption of train movement and formation of a deep pylon station. In the middle station tunnel, a passenger platform is constructed with technical rooms located under it, in places of passengers passage from middle station tunnel into cars, prefabricated elements of lining of middle tunnel and running tunnels are partially dismantled. Then monolithic reinforced concrete pylons are concreted, in which there are openings for passage of passengers, and running tunnels within metro station are converted into side station tunnels. Between the middle station tunnel and the side tunnels galleries are formed within the station along the existing running tunnels, having monolithic reinforced concrete roof and tray slab. In side station tunnels on the side of galleries monolithic reinforced concrete walls are erected, note here that upper arches and chute plates of lining of galleries on side of side tunnels rest on monolithic walls concreted in side tunnels. On the side of the middle tunnel within the pylons, the arch and the chute plate of the galleries are supported by reinforced concrete pylons, at the rest of the station, the gallery structures are left closed. Between galleries and side station tunnels openings are constructed for passage of passengers, made in monolithic reinforced concrete walls of side tunnels, in which sliding doors are installed on side of side tunnels.
EFFECT: reduction of excavation and low-mechanized works volumes during construction of a pylon station on an operating metro line, guaranteed provision of works without stopping movement of subway lines, reduced consumption of finishing materials during construction of subway station, and increased safety of passengers.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTING DEEP UNDERGROUND STATION ON OPERATING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2825811C1 |
METHOD FOR CONSTRUCTING METRO STATION FROM PREFABRICATED ELEMENTS USING CLOSED METHOD OF PERFORMING WORK ON EXISTING METRO LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2815900C1 |
METHOD FOR CONSTRUCTING UNDERGROUND STATION USING CLOSED METHOD OF CARRYING OUT WORK ON EXISTING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2810984C1 |
DOUBLE-VAULTED PYLON SUBWAY STATION, CONSTRUCTED BY TRENCHLESS METHOD | 2019 |
|
RU2735506C1 |
COLUMNED TRIPLE-ARCHED SUBWAY STATION WITHOUT SIDE PLATFORMS | 2009 |
|
RU2410495C1 |
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL | 2018 |
|
RU2692518C1 |
THREE-ARCHED UNDERGROUND STATION OF THE CLOSED METHOD FOR THE PYLON-TYPE WORKS PERFORMANCE | 2022 |
|
RU2795446C1 |
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS | 2022 |
|
RU2779168C1 |
THREE-VAULT METRO STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2019 |
|
RU2715493C1 |
METHOD FOR CREATING UPPER CROSS-CUT ABUTTING JOINT OF APPROACH TUNNEL TO EXISTING METROPOLITAN PILOT STATION CONSTRUCTED WITHOUT INTERRUPTION OF STATION OPERATION | 2020 |
|
RU2745310C1 |
Authors
Dates
2024-08-12—Published
2023-11-23—Filed