FIELD: oil and gas production.
SUBSTANCE: procedure consists in pulse treating bottomhole reservoir zone by pumping fluid into flow string installed into bore of oil well or casing string by means of pump arranged at wellhead. Packers with orifices at height of a tubing string are additionally installed in a gap between the tubing string and surface of borehole or casing string. The pump is pressurising fluid containing fibres, till there is formed a plug in a lower part of the tubing string. When consumption drops for value exceeding characteristic amplitude of fluctuations at constant pressure in the pump, then there is pumped fluid without fibres, and pressure in the pump gradually rises to the moment of rapid growth of fluid consumption. Spherical elements can be also used to form the plug. Notably, diametre of an outlet orifice of the tubing string is less, than internal diametre of the tubing string, while diametre of each spherical element is bigger, than diametre of the outlet orifice of the tubing string.
EFFECT: increased efficiency of the procedure at hydraulic fracturing of reservoir.
6 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR TREATMENT OF BOTTOMHOLE RESERVOIR ZONE | 2009 |
|
RU2411354C1 |
METHOD OF STIMULATION ON BOTTOM-HOLE ZONE OF RESERVOIR | 1994 |
|
RU2085720C1 |
METHOD OF REDUCING SAND PRODUCTION OF OIL WELLS | 2015 |
|
RU2604100C1 |
METHOD OF DIB HOLE PREPARATION FOR HYDRAULIC FRACTURING | 2016 |
|
RU2622961C1 |
METHOD FOR IMPACT INFLUENCE ONTO OIL LAYER | 2002 |
|
RU2229021C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN A PETROLEUM PRODUCTION BOREHOLE FROM AN UNDERLYING AQUIFER | 2021 |
|
RU2776018C1 |
METHOD OF TREATING HOLE-BOTTOM ZONE OF WELL | 0 |
|
SU1559127A1 |
METHOD FOR HYDRAULIC FRACTURING OF BED | 2003 |
|
RU2244815C1 |
METHOD FOR EXTRACTING OF HIGH-VISCOSITY OIL | 2002 |
|
RU2232263C2 |
METHOD OF HEAT TREATMENT OF BOTTOM-HOLE ZONE OF OIL-GAS WELL | 2000 |
|
RU2168619C1 |
Authors
Dates
2011-02-20—Published
2009-12-30—Filed