FIELD: mining.
SUBSTANCE: method of erecting of washed up protective dam includes dumping and layer-by-layer building of protective dam 1 and separating dam 4, routing of main and distributing sludge line 2, layer-by-layer dispersed banking of tailings for inner beach 3. Note that building of separating dam 4 is performed by layer-by-layer location of sleeve from non-woven geotextile perpendicularly to flow front and filling the sleeves with tailings 5 with formation of ground dam 4.
EFFECT: method allows decreasing of labour intensiveness, capacity and material expenses, increasing of tailing pond active capacity, increasing of facility general stability and service life, provision of advanced growth of protective dam.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ERECTING OF WASHED UP PROTECTIVE DAM | 2009 |
|
RU2421568C1 |
ERECTION METHOD OF ALLUVIAL DAM | 2010 |
|
RU2451131C2 |
METHOD FOR ALLUVIAL DAM ERECTION | 2017 |
|
RU2654718C1 |
PROCESS OF ERECTION OF ALLUVIAL MAN-MADE DEPOSIT | 2000 |
|
RU2186902C1 |
METHOD TO ERECT EMBANK HYDRAULIC FILL DAM | 2012 |
|
RU2498008C1 |
METHOD OF UP SLUDGE POND DAM | 2011 |
|
RU2486310C1 |
METHOD OF BUILDUP OF SMALL-SECTION TIRE DAM OF SLUDGE STORAGE | 2016 |
|
RU2615364C1 |
METHOD OF TAILING DUMP FORMATION | 2000 |
|
RU2162151C1 |
RECULTIVATION METHOD OF COMPARTMENT OF INWASH STORAGE UNIT, WHICH IS FILLED WITH WASTES | 2009 |
|
RU2409743C1 |
METHOD OF CONSTRUCTING A DAM OF LOCALLY AVAILABLE MATERIALS | 0 |
|
SU866032A1 |
Authors
Dates
2011-06-20—Published
2010-03-26—Filed