FIELD: mining.
SUBSTANCE: erection method of alluvial dam 3 involves backfill and tier-by-tier buildup of dam 3, routing of main and distributing pulp line 4, tier-by-tier distributed alluviation of tails onto beach 5. Dam 3 alluviation is performed by tier-by-tier arrangement of two hoses 1 and 2 from non-woven geotextile material, which are located at the required distance from each other, filling of hoses and gap between them with tails. At that, external hose 1 is made from non-woven and non-filtering geotextile material with an insert from filtering material for water removal, which faces the beach. Internal hose 2 is made from non-woven filtering geotextile material.
EFFECT: method allows reducing labour intensity and material consumption and increasing useful capacity of tail storage and operating life of facility.
2 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF ERECTING OF WASHED UP PROTECTIVE DAM | 2010 | 
 | RU2421569C1 | 
| METHOD OF ERECTING OF WASHED UP PROTECTIVE DAM | 2009 | 
 | RU2421568C1 | 
| METHOD FOR ALLUVIAL DAM ERECTION | 2017 | 
 | RU2654718C1 | 
| PROCESS OF ERECTION OF ALLUVIAL MAN-MADE DEPOSIT | 2000 | 
 | RU2186902C1 | 
| METHOD OF BUILDUP OF SMALL-SECTION TIRE DAM OF SLUDGE STORAGE | 2016 | 
 | RU2615364C1 | 
| METHOD TO ERECT EMBANK HYDRAULIC FILL DAM | 2012 | 
 | RU2498008C1 | 
| METHOD OF UP SLUDGE POND DAM | 2011 | 
 | RU2486310C1 | 
| ALLUVIAL HYDRAULIC STRUCTURE | 2020 | 
 | RU2742145C1 | 
| RECULTIVATION METHOD OF COMPARTMENT OF INWASH STORAGE UNIT, WHICH IS FILLED WITH WASTES | 2009 | 
 | RU2409743C1 | 
| METHOD OF TAILING DUMP FORMATION | 2000 | 
 | RU2162151C1 | 
Authors
Dates
2012-05-20—Published
2010-08-20—Filed