FIELD: mining.
SUBSTANCE: erection of alluvial dam includes filling and bench by bench build-up of the separating dam 4, placement of hoses made of nonwoven geotextile filtering material 6 perpendicularly to the edge of flow propagation, filling of sleeves 6 with tailings 5 with formation of ground dam 4 in casing on the side of the tailing dump pond 8, and creation of impermeable screen of non-filtering geotextile material 7 to prevent filtration from the tailing dump on the side of the dam 1.
EFFECT: improved concentrating plants tailings deposition technology on dump bed soils of different water permeability, improved dam stability.
1 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF ERECTING OF WASHED UP PROTECTIVE DAM | 2010 | 
 | RU2421569C1 | 
| ERECTION METHOD OF ALLUVIAL DAM | 2010 | 
 | RU2451131C2 | 
| METHOD OF ERECTING OF WASHED UP PROTECTIVE DAM | 2009 | 
 | RU2421568C1 | 
| PROCESS OF ERECTION OF ALLUVIAL MAN-MADE DEPOSIT | 2000 | 
 | RU2186902C1 | 
| WASHED-UP HYDRAULIC STRUCTURE | 1991 | 
 | RU2039151C1 | 
| METHOD TO ERECT EMBANK HYDRAULIC FILL DAM | 2012 | 
 | RU2498008C1 | 
| METHOD OF UP SLUDGE POND DAM | 2011 | 
 | RU2486310C1 | 
| 0 | 
 | SU1778218A1 | |
| ALLUVIAL HYDRAULIC STRUCTURE | 2020 | 
 | RU2742145C1 | 
| METHOD OF CONSTRUCTING A DAM OF LOCALLY AVAILABLE MATERIALS | 0 | 
 | SU866032A1 | 
Authors
Dates
2018-05-22—Published
2017-01-27—Filed