FIELD: mining.
SUBSTANCE: method of repair consists in application of a repair layer along the whole area of the inner surface of the pressed concrete lining. Then at least one layer of reinforcement net from carbon or other similar (aramid or glass fibre) with elasticity module of at least 100 GPa and strength of at least 3 GPa on the inner surface of the repair lining layer with a polymer glue. The total area of cross section of longitudinal fibres of the reinforcement net must be at least 1.5 times more than the total area of cross fibres. Then the reinforcement mesh impregnated with glue is coated with an additional repair layer with thickness of 0.05-0.1 from thickness of the initial pressed concrete lining, having the following physical and mechanical characteristics: compression strength of at least 40 MPa; - bending strength of at least 10 MPa; tensile strength of at least 5 MPa; adhesion to concrete of at least 2.5 MPa. On the inner surface of the repair lining layer several layers of polymer reinforcement mesh may be attached by means of a polymer glue as separated with a repair layer.
EFFECT: reduced cost, improved strength characteristics.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIR AND/OR REINFORCEMENT OF MOIST AND/OR SALINE REINFORCED CONCRETE STRUCTURES | 2012 |
|
RU2484218C1 |
METHOD TO REINFORCE DEFECTIVE LINING OF TUNNEL | 2012 |
|
RU2511168C1 |
COMPOSITE REINFORCEMENT | 2011 |
|
RU2482248C2 |
METHOD FOR STRENGTHENING OF REINFORCED CONCRETE RIBBED FLOOR SLAB AND HELICAL POLYMER SCREED | 2008 |
|
RU2374409C1 |
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) | 2012 |
|
RU2510444C2 |
METHOD TO STRENGTHEN REINFORCED CONCRETE STRUCTURES | 2010 |
|
RU2451144C1 |
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2704414C1 |
NANOHYBRID PROTECTIVE COMPOSITE | 2009 |
|
RU2420704C1 |
TITANIUM POLYMER LAMINATE MATERIAL AND PRODUCTS MADE OF IT | 2023 |
|
RU2812315C1 |
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL | 2018 |
|
RU2692518C1 |
Authors
Dates
2011-11-10—Published
2010-05-11—Filed