FIELD: construction.
SUBSTANCE: method includes erection of bulkhead structures 4 with discharge openings 5 at river bed 1. At that water is accumulated in ponds and water reservoirs at level higher than location of bulkhead structures 4 by opening of discharge openings 5 in structures 4. Bulkhead structures 4 are created by ice-cakes freezing in winter period in pits 3 made in silty areas 2 in autumn. Space under ice-cake serves as discharge opening 5. At that ice-cake 4 cis shifted by water flow along the stream until it thrusts into soil and rises at bottom height. Ice-cake 4 creates water accumulation in volume and water head down-stream. At areas where river made meanders pit 3 is made with entry to side of river bed straightening with calculation of intense flow channel closure by ice-cake 4 towards old river bed. Straightened section will create cut-off meander 7.
EFFECT: method allows recovery of natural river bed, preservation of ichthyofauna and reduce consumption of resources.
Title | Year | Author | Number |
---|---|---|---|
DEVICE TO PROTECT BRIDGES AGAINST FLOATING TREES | 2013 |
|
RU2560616C2 |
METHOD TO CLEAN RIVER BEDS NEAR BRIDGES | 2013 |
|
RU2533912C1 |
DEVICE FOR PROTECTION OF HYDROTECHNICAL AND BRIDGE STRUCTURES FROM FLOATING TREES | 2016 |
|
RU2664835C2 |
METHOD FOR CLEANING, DEEPENING AND STRAIGHTENING OF RIVER BED | 1992 |
|
RU2086729C1 |
RIVER FLOW CONTROL METHOD | 2006 |
|
RU2306384C1 |
METHOD OF RESERVOIR WATER AREA LOCALIZATION OF POLLUTANTS ENTERING RESERVOIR FROM TRIBUTARIES AND DRAINS | 2017 |
|
RU2665072C1 |
METHOD OF WATER FLOW REGULATION AND CONCENTRATION OF SUSPENDED PARTICLES IN DEFLECTING CHANNEL | 2006 |
|
RU2334841C2 |
METHOD FOR MANAGING PURIFICATION OF CONTAMINATED SURFACE AND DRAINAGE WATER | 2023 |
|
RU2809066C1 |
METHOD OF PROTECTION AGAINST MUD STREAMS | 2014 |
|
RU2550120C1 |
METHOD FOR REGULATING WATER FLOW IN RIVER CHANNELS FOR PREVENTING FLOODS | 2017 |
|
RU2683224C1 |
Authors
Dates
2012-05-10—Published
2010-07-07—Filed