FIELD: electricity.
SUBSTANCE: method consists in measuring longitudinal stretching forces by strain gage transducer that are applied to wire, measuring of wire temperature, measurement values are transmitted to central point by radio channel or fiber-optics, note that power supply is provided by power source, according to the invention as an elastic element of strain gage transducer of measuring longitudinal stretching forces applied to wire there used is a segment of controlled wire of overhead electric line and ice presence is determined by the values of longitudinal stretching forces applied to wire and wire temperature, note that power supply is provided by potential transformer, the primary winding of which is represented by controlled wire itself that conducts operating current.
EFFECT: increase of reliability of ice determination on wires of overhead electric line through direct measurement of longitudinal stretching forces applied to wire of electric line, wire temperature control, receiving power directly from controlled wire itself.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO MONITOR SAGGING OF POWER TRANSMISSION LINE WIRE | 2012 |
|
RU2494511C1 |
MONITORING SYSTEM FOR ICE AND FROST DEPOSITS ON WIRES AND LIGHTNING PROTECTION CABLES OF 110-220 kV OVERHEAD LINES | 2021 |
|
RU2761084C1 |
DEVICE FOR MONITORING ICING FORMATION ON LIGHTNING PROTECTION CABLES OF OVERHEAD POWER LINES 110-220 kV | 2018 |
|
RU2707393C1 |
SYSTEM OF MECHANICAL LOAD CONTROL AT EXTENDED ELEMENTS OF OVERHEAD TRANSMISSION LINE | 2013 |
|
RU2533178C1 |
METHOD FOR REMOVING ICE AND ICY DEPOSITS FROM ELECTRICAL WIRES AND LIGHTNING PROTECTION CABLES OF OVERHEAD POWER LINE | 2020 |
|
RU2769171C1 |
OVERHEAD TRANSMISSION LINES WIRES ICE LOADS CONTROL SYSTEM | 2017 |
|
RU2658344C1 |
ICE MASS AND END-OF-ICE-MELTING INDICATOR | 2002 |
|
RU2220485C1 |
METHOD FOR MEASUREMENT OF ICE AND WIND LOAD ON OVERHEAD ELECTRIC LINES | 2011 |
|
RU2461941C1 |
METHOD AND SYSTEM FOR AUTOMATIC CONTROL OF THE CONDITION OF A WIRE OF OVERHEAD POWER LINES | 2018 |
|
RU2771882C1 |
METHOD OF THE OVERHEAD TRANSMISSION LINES SUPPORTS DYNAMIC TESTING | 2017 |
|
RU2654897C1 |
Authors
Dates
2012-09-20—Published
2011-07-21—Filed