FIELD: electricity.
SUBSTANCE: first intelligent electronic device (21) prepares an answer related to blocking, indicating condition of opening or blocking of the first switching device (111). A testing device (30) differing from the first intelligent electronic device (21) prepares a status of blocking, indicating condition of opening or blocking of the first switching device (111). The answer related to blocking is compared with the blocking status. At the same time the blocking status is identified by the testing device (30) on the basis of blocking rules and dynamic topology of a power substation produced on the basis of a standardised description of the static topology of a substation and the dynamic status of switching of the second switching devices (110a, 110b) of the power substation.
EFFECT: facilitation and expansion of a system level of testing of power substation automation systems blocking functions.
6 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
INSPECTION OF INTELLIGENT ELECTRONIC DEVICE CONFIGURATION | 2007 |
|
RU2431913C2 |
SYSTEM LEVEL TESTING FOR SUBSTATION AUTOMATION SYSTEMS | 2007 |
|
RU2402784C2 |
INSPECTION OF INTELLIGENT ELECTRONIC DEVICE CONFIGURATION | 2007 |
|
RU2427871C2 |
ANALYSING COMMUNICATION CHARACTERISTICS OF INTELLIGENT ELECTRONIC DEVICE (IED) | 2010 |
|
RU2440685C1 |
METHOD FOR PREVENTING EMERGENCY ACTIONS DURING OPERATIONAL MANAGEMENT OF TECHNOLOGICAL OBJECT | 2020 |
|
RU2758449C1 |
DATA BLOCK TRANSMISSION AND COMMUNICATION NETWORK | 2011 |
|
RU2534931C2 |
COMMUNICATION NETWORK OF A DIGITAL SUBSTATION FOR CONTROLLING TIME-CRITICAL PROCESSES IN THE AREA OF RELAY PROTECTION AND AUTOMATION BASED ON A PASSIVE OPTICAL NETWORK | 2021 |
|
RU2780459C1 |
THREE-PORT BACKUP DEVICE FOR RING COMMUNICATION NETWORK | 2012 |
|
RU2484593C1 |
CENTRALIZED INTELLIGENT ELECTRONIC DEVICE OF AUTOMATED ELECTRICAL SUBSTATION SYSTEM | 2019 |
|
RU2720318C1 |
AUTOMATION SYSTEM WITH DYNAMIC FUNCTIONAL ARCHITECTURE | 2018 |
|
RU2679739C1 |
Authors
Dates
2012-10-20—Published
2008-10-17—Filed