FIELD: construction.
SUBSTANCE: ballast prism contains crushed stone joined with a binding material on the basis of synthetic latex into an elastic monolith with open through pores. At the same time 0.15-0.20 of the volume is represented by a rubber-like fraction of 10-20 mm, produced by crushing of used car tyres and other recycled products from rubber-like materials.
EFFECT: reduced damage of crushed stone with appropriate resource increase.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO REINFORCE RAILWAY TRACK | 2010 |
|
RU2448212C2 |
METHOD OF STRENGTHENING TRACK BALLAST SECTION | 2011 |
|
RU2469145C1 |
METHOD OF REINFORCING RAILWAY TRACK BALLAST SECTION | 2014 |
|
RU2583112C2 |
METHOD FOR INCREASING LATERAL STABILITY OF RAIL TRACK ON BALLAST BASE | 2018 |
|
RU2701635C1 |
SLEEPER | 2010 |
|
RU2422575C1 |
RAILWAY FORK | 2020 |
|
RU2745939C1 |
METHOD TO REINFORCE RAILWAY TRACK | 2013 |
|
RU2535378C1 |
PRODUCTION OF ROAD-METAL | 2014 |
|
RU2556550C1 |
RAILWAY RAIL LENGTH (VERSIONS) | 2007 |
|
RU2381317C2 |
METHOD OF DIGGING CRUSHED STONE | 2020 |
|
RU2745932C1 |
Authors
Dates
2013-02-20—Published
2011-04-12—Filed