FIELD: electrical engineering.
SUBSTANCE: subject-matter of the method involves switching on of each furnace in the group with a certain delay in time, and namely, start-up of the ready to launch electric arc furnace when melting period of the previous furnace is over in start-up sequence.
EFFECT: reduction of specific energy consumption, increase in efficiency of the group of electric arc furnaces and minimisation of their negative impact on supply mains.
3 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
CONTROL METHOD FOR REACTIVE POWER CONSUMED BY GROUP OF ARC FURNACE | 2007 |
|
RU2338338C1 |
METHOD OF POWER CONTROL IN EAF AND LADLE FURNACE GROUP | 2015 |
|
RU2611605C1 |
ELECTRIC-ARC STEEL MELTING FURNACE DUTY CONTROL SYSTEM | 1991 |
|
RU2066939C1 |
METHOD FOR ADJUSTING POWER BY PHASES OF THREE-ELECTRODE ALTERNATING-CURRENT ARC FURNACE | 2004 |
|
RU2275759C1 |
PHASE-BY-PHASE POWER CONTROL METHOD OF THREE-ELECTRODE ALTERNATING CURRENT ELECTRIC FURNACE | 2010 |
|
RU2424639C1 |
SYSTEM FOR CONTROLLING ELECTRIC CONDITIONS OF ELECTRIC-ARC FURNACES UNDER GROUP OPERATION DURING MAXIMUM ENERGY CONSUMPTION PERIOD | 0 |
|
SU1162063A1 |
POWER CONTROL METHOD OF ALTERNATING-CURRENT ELECTRIC ARC FURNACE USING CONTROLLED COMBINED REACTOR TRANSFORMER | 2010 |
|
RU2476034C2 |
METHOD TO CONTROL CAPACITY OF ARC THREE-ELECTRODE AC ELECTRIC FURNACE WITH APPLICATION OF SINGLE-PHASE CONTROLLED REACTORS | 2010 |
|
RU2432718C1 |
DEVICE FOR CONTROLLING POWER SUPPLY CONDITIONS OF MULTIPHASE ELECTRIC-ARC FURNACE | 2002 |
|
RU2238616C2 |
METHOD FOR ADJUSTING POWER OF THREE-PHASED ALTERNATING-CURRENT ELECTRIC ARC FURNACE | 2004 |
|
RU2275758C1 |
Authors
Dates
2013-06-27—Published
2011-03-16—Filed