FIELD: metallurgy.
SUBSTANCE: method of power control in EAF and ladle furnace group relates to electrical engineering, namely to electrometallurgy, and also to the power control methods in group of EAFs and ladle furnaces. At the start of each ready-to-start electric arc furnace with the holding time not exceeding the duration of the melt period of the electric arc furnace formerly started, within the allowed adjustment range, when excessing the allowed active power value in the start of each ready-to-start ladle furnace with the holding time within the allowed adjustment range corresponding to the lowest value of active power consumption per a fixed day hour.
EFFECT: increased capacity of EAF and ladle furnace group, reduced maximum active power consumption per a fixed day hour.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REGULATION OF POWER CONSUMED BY GROUP OF ALTERNATING-CURRENT ELECTRIC ARC FURNACES | 2011 |
|
RU2486716C2 |
METHOD AND PRODUCTION LINE FOR STEEL-MAKING PROCESS | 2005 |
|
RU2285050C1 |
METHOD OF MAKING HIGH-ALLOY STEEL | 2003 |
|
RU2255983C1 |
METHOD AND CHARGE FOR MANUFACTURE OF STRUCTURAL CARBON STEEL WITH REDUCED HARDENING CAPACITY IN STEEL-MAKING ARC-TYPE FURNACE | 2012 |
|
RU2534715C2 |
CONTROL METHOD FOR REACTIVE POWER CONSUMED BY GROUP OF ARC FURNACE | 2007 |
|
RU2338338C1 |
METALLURGICAL COMPLEX | 2009 |
|
RU2441074C2 |
METHOD OF STEEL SMELTING, DEOXIDATION, ALLOYING AND TREATMENT | 2009 |
|
RU2405046C1 |
SMELTING TECHNIQUE OF STEEL IN ARC STEEL-SMELTING FURNACE | 2007 |
|
RU2343206C1 |
METALLURGICAL COMPLEX | 2014 |
|
RU2571980C2 |
METHOD OF MELTING OF CARBONIC AND LOW ALLOYED GRADES OF STEEL | 2006 |
|
RU2336310C2 |
Authors
Dates
2017-02-28—Published
2015-09-15—Filed