METHOD FOR CONSTRUCTION OF COLUMN-TYPE TWO-VANE SUBWAY STATION BY CLOSED METHOD OF PERFOMING WORKS Russian patent published in 2019 - IPC E02D29/00 

Abstract RU 2704415 C1

FIELD: construction; subway.

SUBSTANCE: invention relates to construction of tunnels, in particular to a method of constructing subway stations of column type of closed method of performing works. Method of erecting a double-vane subway station with a closed method of performing works involves the construction of a left station tunnel by mounting the round lining of lining made of reinforced concrete tubes, the diameter of which provides the arrangement of the structure of a single track. During installation of assemblage lining of left station tunnel upper and lower support blocks are installed, made with cross section in form of octahedron with symmetrical facets relative to vertical axis of station. Between the upper and lower support blocks in the lining of the left station tunnel, tubing temporary filling is mounted, on the lower support unit the lower tangential support part is installed and connected to the lower unit through welding to metal pins inserted into the seams between blocks, and filling clearance between lower tangential support part and lower support block with non-shrinking mixture, after which concreting the lower reinforced concrete cross-bar with cross section in form of trapezoid, smaller base of which rests on lower tangential support part. Then monolithic reinforced concrete columns and horizontal girders of arched type are concreted, to embedded elements of which there connected are upper tangential support parts by means of welded seams, at that construction of horizontal girders of arched type provides creation of passes between station tunnels, formed gaps between upper support block, upper tangential support part and monolithic horizontal crossbars are filled with non-shrinking mixture. Thereafter, a right-hand station tunnel is assembled from an assemblage of lining of circular outline, made of reinforced concrete tubes, diameter of which provides arrangement of the single-track track structure, and resting on the upper and lower support blocks, by dismantling the temporary filling tubes, then, concrete bases of station tunnels are concreted with horizontal outer surface simultaneously with base under the track and passenger platform is built in each station tunnel.

EFFECT: technical result consists in ensuring the cost of erection of the station, high technological effectiveness and speed of construction.

1 cl, 4 dwg

Similar patents RU2704415C1

Title Year Author Number
DOUBLE-VAULTED PYLON SUBWAY STATION, CONSTRUCTED BY TRENCHLESS METHOD 2019
  • Zakharov Georgij Rafaelevich
  • Tyushevskaya Lidiya Valentinovna
  • Fadeeva Vera Borisovna
RU2735506C1
METHOD FOR ERECTION OF THREE-VAULT SUBWAY STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS 2020
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
  • Fadeeva Vera Borisovna
RU2729474C1
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL 2019
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
RU2704414C1
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) 2012
  • Jurkevich Pavel Borisovich
RU2510444C2
METHOD FOR CONSTRUCTING METRO STATION FROM PREFABRICATED ELEMENTS USING CLOSED METHOD OF PERFORMING WORK ON EXISTING METRO LINE WITHOUT INTERRUPTING TRAIN TRAFFIC 2023
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
RU2815900C1
THREE-VAULT METRO STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS 2019
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
RU2715493C1
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL 2018
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Donenko Ekaterina Evgenevna
RU2692518C1
SINGLE-VAULT METRO STATION WITH CAST REINFORCED CONCRETE LINING, BUILT BY A CLOSED METHOD FOR WORK PERFORMANCE 2021
  • Zakharov Georgij Rafaelevich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
  • Fadeeva Vera Borisovna
RU2758820C1
CONSTRUCTION METHOD OF DEEP-LAID DOUBLE-ARCHED UNDERGROUND STATION 2013
  • Davtjan Nikol Grigor'Evich
  • Esajan Armen Tigranovich
  • Davtjan Ovannes Nikol'Evich
RU2536539C2
METHOD FOR CONSTRUCTING UNDERGROUND STATION USING CLOSED METHOD OF CARRYING OUT WORK ON EXISTING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC 2023
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Fadeeva Vera Borisovna
RU2810984C1

RU 2 704 415 C1

Authors

Zakharov Georgij Rafaelevich

Maslak Vladimir Aleksandrovich

Tyushevskaya Lidiya Valentinovna

Donenko Ekaterina Evgenevna

Dates

2019-10-28Published

2019-01-09Filed