FIELD: construction.
SUBSTANCE: steel pillar double tee is equipped with fastening nuts and setting screws with hidden heads and screwed-in sharpened end. The elements of the sheet lining are fixed tightly to the shelves of the pillar double tee, elements of the tile lining - tightly to the double tee wall. Thickness of elements of fireproof lining is pre-determined with account of thermal properties of its materials, conditions of pillar double tee heating during fire and normative limit of building pillar fire resistance.
EFFECT: increased reliability of fixation of elements of large-size lining, increased limit of steel pillar fire resistance, reduced risk of pillar collapse in initial stage of fire.
13 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FLAME RETARDANCE OF I-SHAPED BUILDING COLUMN | 2012 |
|
RU2518599C1 |
FIREPROOF DOUBLE-TEE BEAM OF BUILDING | 2012 |
|
RU2517313C1 |
METHOD OF BUILDING I-BEAM FIRE PROTECTION | 2012 |
|
RU2522110C2 |
DESIGN OF FIRE-PROOF STEEL BEAM | 2017 |
|
RU2651997C1 |
FIRE-PROOF METAL CAST-IRON BUILDING SUPPORT | 2019 |
|
RU2709532C1 |
METHOD OF DETERMINING FIRE SAFETY CHARACTERISTICS OF ELEMENTS AND MATERIALS OF COMPLEX FACING OF STEEL BEAM WITH CORRUGATED WALL | 2016 |
|
RU2639209C1 |
METHOD OF CAST-IRON SUPPORT OF BUILDING FIRE PROTECTION | 2019 |
|
RU2714401C1 |
BUILDING COVERING RECONSTRUCTION METHOD | 2006 |
|
RU2340738C2 |
SUSPENSION OF FIRE RETARDANT FALSE CEILING BEAM CEILING OF BUILDING | 2023 |
|
RU2812394C1 |
FIREPROOF SUSPENDED CEILING OF BUILDING | 2023 |
|
RU2806393C1 |
Authors
Dates
2014-05-27—Published
2012-10-25—Filed