FIELD: mining.
SUBSTANCE: tank is communicated with effluent intake line composed of a pipeline system equipped with check valve Note here that said valve is communicated with the pump Said effluent intake line is equipped with safety valve communicated via pipeline with standby measuring tank Said effluent intake line is connected with one end of coil rigidly secured in horizontal cylindrical casing Walls of the latter, at its top and bottom parts, have openings Second end of aforesaid coil is connected with nozzle located at gas flare plant flame zone Head of said plant is secured at the end of aforesaid cylindrical casing Effluents are accumulated in said tank to be, then, forced by pump via said intake line into coil to be finely sprayed and directed to spray nozzle Note here that said nozzle is located at gas flare plant flame zone.
EFFECT: higher efficiency, better environmental protection, lower costs.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RECYCLING LIQUID PHASE OF DRILLING WASTES | 2015 |
|
RU2599743C1 |
WELL DRILLING WASTE UTILISATION METHOD | 2010 |
|
RU2425815C1 |
METHOD FOR OPERATION OF GROUP OF WATERING WELLS | 2018 |
|
RU2679174C1 |
PROCEDURE FOR SUMP BUILDING AT CONSTRUCTION OF OIL-GAS CONDENSATE DEPOSITS | 2010 |
|
RU2431733C1 |
METHOD FOR PREPARING WATER FOR FEEDING INTO FORCE WELLS | 2003 |
|
RU2239698C1 |
MOBILE STEAM PLANT | 2001 |
|
RU2181177C1 |
PLANT FOR BURNING GASEOUS FUEL IN CATALYTIC HOT-WATER FLUIDIZED-BED BOILER | 2004 |
|
RU2249152C1 |
DEVICE FOR THERMAL NEUTRALIZATION OF INDUSTRIAL WASTE WATER | 2022 |
|
RU2799897C1 |
MOBILE OIL PREPARATION INSTALLATION IN EARLY PRODUCTION TECHNOLOGY | 2021 |
|
RU2789197C1 |
WELL SURVEYING FACILITY | 2010 |
|
RU2438015C1 |
Authors
Dates
2014-05-27—Published
2013-03-04—Filed