FIELD: construction.
SUBSTANCE: invention relates to industrial or civil construction, in particular to determine the stability of frozen soils, and can be used in construction of oil and gas pipelines to determine the degree of soil stability to thermoerosional washout. A method of modelling the horizontal thermoerosional washout of frozen soils includes the preliminary positioning of the soil sample in the cuvette, saturation of the soil sample with water up to the specified moisture, application of a drainage line of the certain width on the surface of the sample and freezing of the soil sample in the cuvette with the closed lid in the cooling chamber to a determined temperature for minimum one day, the cuvette placing with the prepared soil sample with the open sector under the water supply facility at an angle, depending on the specified parameters of modelling, and erosion of the soil sample by water course. The width of the drainage line, water temperature and flow of the watercourse are adjustable, in this case the measurements of direct indexes are conducted - a depth of thawing and soil erosion, water temperature, width and depth of the water flow within the selected time interval, on the basis of which the indirect parameters of thermoerosional washout are determined: intensity of washout, erosion-preventive resistance of soil, water flow mechanical energy, water flow thermal energy, thermal flow expended for melting of frozen soil, thermal flow due to dissipation of mechanical energy, heat transfer coefficient between the water flow and frozen soil by the given dependences.
EFFECT: providing determination of a set of parameters, characterising the thermal erosion process of soils under the influence of the water flow.
3 tbl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING A CANAL IN PERMAFROST SOIL | 0 |
|
SU1117363A1 |
METHOD FOR STABILIZATION OF WASHING-AWAY BANKS OF TUNDRA RIVERS | 1999 |
|
RU2149947C1 |
METHOD OF CONSTRUCTING A CANAL | 0 |
|
SU1063914A1 |
METHOD OF INSTALLING AGROUND IN PERMAFROST | 2004 |
|
RU2276825C2 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
METHOD OF LAND RECLAMATION IN PERMAFROST ZONE | 2022 |
|
RU2813788C1 |
METHOD FOR PHASED COMPLEX ENGINEERING PROTECTION OF GENERAL PLANNING EMBANKMENT | 2008 |
|
RU2390605C1 |
METHOD OF LAND RECLAMATION IN PERMAFROST ZONE | 2022 |
|
RU2813665C1 |
METHOD FOR DETERMINING ERODIBLE RESISTANCE OF SOIL | 0 |
|
SU1712867A1 |
METHOD OF PREVENTING MUD FLOW OF GLACIATIONAL GENESIS | 2006 |
|
RU2341614C2 |
Authors
Dates
2014-06-27—Published
2012-08-14—Filed