FIELD: mining; building.
SUBSTANCE: method of preventing mud flow of glaciational genesis consists in forming channel through protecting bank made out of gravel-pebbles-boulder soil for flowing out of melt water from inrush hazardous lake adjacent to glacier where lake is fed with melt water from glacier tongue. The channel for flowing out of water from the inrush hazardous adjacent to glacier lake is formed on the side from the place of the protecting bank joining to the glacier tongue with depth equal to the depth of the lake. Whole capacity of the lake is completely under control filled with local gravel-pebbles-boulder soil. There is foreseen ditching of channel through the protecting bank, which is a watershed, into a bed of a neighbour and not mud flow hazardous part of a water course.
EFFECT: elimination of inrush hazardous lake by means of displacement of its water mass with local soil and prevention of mud flow of glaciational genesis occurring.
2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD TO LIQUIDATE PERIGLACIAL LAKE WITH RISK OF BREAKTHROUGH | 2010 |
|
RU2441112C1 |
METHOD FOR PREVENTIVE WATER DISCHARGE FROM LAKE IN THE RISK OF BREACHING THEREOF | 2003 |
|
RU2256741C2 |
WATERWORKS FACILITY FOR PROTECTION AGAINST MUDFLOW | 2002 |
|
RU2230153C2 |
METHOD OF PROTECTION AGAINST MUD STREAMS | 2014 |
|
RU2550120C1 |
METHOD OF ESTIMATING SIMULTANEOUS MAXIMUM POSSIBLE VOLUME OF SOLID MUDFLOW CONE INTO MUDFLOW RIVER CHANNEL DURING MUDFLOW DESCENT | 2015 |
|
RU2618494C1 |
HYDRO-SYSTEM FOR PROTECTION AGAINST MUDFLOW | 2003 |
|
RU2232225C1 |
METHOD OF SUPPLYING BED OF PROJECTED NAVIGATION CANAL "EVRASIYA" WITH RUNNING SWEET WATER | 2008 |
|
RU2471040C2 |
METHOD OF LAND RECLAMATION, DISTURBED BY DREDGING WORKS | 2013 |
|
RU2527368C1 |
METHOD OF WATER ACCUMULATION ON SLOPES | 2017 |
|
RU2667727C1 |
ERECTION METHOD OF BATTER DRAINAGE EARTH STRUCTURES | 2015 |
|
RU2601802C1 |
Authors
Dates
2008-12-20—Published
2006-11-07—Filed