FIELD: engines and pumps.
SUBSTANCE: invention relates to pump engineering, particularly, to development of super high vacuum. Proposed system comprises getter pump (120; 220) and ion pump (130; 230). Both pumps (120, 220; 130, 230) are mounted at one flange (111; 211) arranged in opposition at the flange opposite sides so that conductivity of both pumps increases in direction of gas flow sources in vacuum chamber.
EFFECT: higher vacuum in the system.
11 cl, 5 dwg, 2 tbl
| Title | Year | Author | Number |
|---|---|---|---|
| COMBINATION PUMP SYSTEM INCLUDING GETTER PUMP AND ION PUMP | 2009 |
|
RU2495510C2 |
| GETTER PUMP | 1998 |
|
RU2199027C2 |
| METHOD OF MATERIAL SPRAYING SPEED CONTROL IN A GETTER PUMP AND A GETTER PUMP DEVICE | 2017 |
|
RU2661493C1 |
| COMBINED MAGNETIC DISCHARGE GETTER-ION PUMP | 0 |
|
SU943920A1 |
| IMPROVED HIGH-POWER GETTER PUMP | 1993 |
|
RU2082251C1 |
| PUMPING DEVICE IMPLYING USE OF NON-EVAPORATING GETTER AND METHODS FOR USING SAID GETTER | 1997 |
|
RU2193254C2 |
| GETTER PUMP | 2013 |
|
RU2639293C2 |
| ION-GETTER PUMP | 0 |
|
SU1102408A1 |
| EVACUATED SOLAR PANEL WITH NON-EVAPORABLE-GETTER-BASED PUMP | 2008 |
|
RU2463529C2 |
| COATING PRODUCED OUT OF THE GETTER-METAL ALLOY, AND ALSO THE INSTALLATION AND THE METHOD OF THE COATING PRODUCTION | 2003 |
|
RU2315819C2 |
Authors
Dates
2014-06-27—Published
2010-03-09—Filed