FIELD: construction.
SUBSTANCE: reinforced concrete board to erect non-submerged foundations is formed with a flat reinforced concrete structure. A flat reinforced concrete structure of a slab is made in the form of two beams crossing at the angle of 90°, and in the place of connection of beams there are curvilinear side vertical surfaces with radius of curvature, equal to 1.5 of beam width. The length of the beam is four times more than its width, at the same time the width of the beam is determined in accordance with the area of the pillar base.
EFFECT: reduced contact stresses in a system of foundation slab-soil base, reduced material intensity and labour intensiveness.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
FOUNDATION UNDER COLUMN GRID | 2013 |
|
RU2552741C2 |
DESIGN AND METHOD FOR ERECTION OF NON-PENETRATABLE FOUNDATION | 2013 |
|
RU2552571C2 |
THREE-DIMENSIONAL FOUNDATION PLATFORM CONNECTED TO TANK TO FORM CLOSED SYSTEM TO BE BUILT ON WEAK, PERMAFROST, HEAVING SOIL AND IN SEISMIC ZONES (VARIANTS) | 2004 |
|
RU2273697C2 |
SINGLE-VAULT MULTILEVEL SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (P.B. YURKEVICH'S DESIGN) | 2014 |
|
RU2562359C2 |
MULTI-PURPOSE CONSTRUCTION FACILITY INCLUDING SEAQUARIUM AND GROUP OF SHOPPING AND ENTERTAINMENT FACILITIES | 2007 |
|
RU2347050C2 |
MULTI-PURPOSE BUILDING | 2007 |
|
RU2345200C2 |
SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (DEVICE AND METHOD NAMED AFTER YURKEVICH PB) | 2012 |
|
RU2505646C2 |
STRIP-MEMBRANE SUBSURFACE FOUNDATION | 2021 |
|
RU2752890C1 |
BRIDGE | 2004 |
|
RU2261303C1 |
METHOD OF ERECTING FOUNDATION | 2016 |
|
RU2626479C1 |
Authors
Dates
2015-02-10—Published
2013-08-23—Filed