FIELD: construction.
SUBSTANCE: invention relates to the field of construction, particularly to building structures, as well as to the construction of foundations and basements. Foundation under the column grid formed by cruciform foundation slabs and ground base. Cruciform foundation slabs are laid on the concrete base and pivotally interconnected by means of reinforced-concrete inserts. Concrete base rests on the solid underlayer, laid on the surface of cleared and compacted ground base. Perimeter of foundation building footprint is surrounded by the wall in the ground, which is embedded in the ground base to the desired depth.
EFFECT: technical result is to provide the load distribution on the entire surface of the ground base, preservation of existing buildings and structures, reduction of the labour intensity.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
REINFORCED CONCRETE SLAB TO ERECT NON-SUBMERGED FOUNDATIONS | 2013 |
|
RU2540738C1 |
METHOD FOR ERECTING SHALLOW AND SURFACE FOUNDATIONS IN THAWED GROUND LOCATED ABOVE UNDERLYING PERMAFROST OR ROCK GROUNDS | 2003 |
|
RU2249082C1 |
DESIGN AND METHOD FOR ERECTION OF NON-PENETRATABLE FOUNDATION | 2013 |
|
RU2552571C2 |
SPATIAL FOUNDATION SUPPORT OF RESERVOIR ON FROZEN BASE | 2014 |
|
RU2572319C1 |
METHOD TO ERECT FOUNDATION | 2010 |
|
RU2420628C1 |
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
METHOD FOR CONSTRUCTION OF PILE-PLATE FOUNDATION | 2021 |
|
RU2774443C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD TO RECOVER CONTACT LAYER "FOUNDATION - SOIL BASE" | 2015 |
|
RU2572477C1 |
METHOD OF ERECTING FOUNDATION | 2016 |
|
RU2626479C1 |
Authors
Dates
2015-06-10—Published
2013-10-23—Filed