FIELD: process engineering.
SUBSTANCE: invention relates to production of mineral wool. Mix is preheated to 300-400°C in service hopper by off gases. Gases are fed by high-pressure blower via gas duct to flue gas distribution structure. The latter is arranged at the hopper bottom part and composed of crossed perforated pipes protected by V-like plate made from steel angle piece with 45 degrees-angle.
EFFECT: higher efficiency of slag melt smelting.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
MINERAL FIBER PLANT | 2020 |
|
RU2743546C1 |
METHOD OF MELTING ASH-SLAG WASTES OF WASTE INCINERATION PLANT | 2022 |
|
RU2814348C1 |
ASH AND SLAG WASTE MELTING SYSTEM OF AN INCINERATION PLANT | 2022 |
|
RU2802494C1 |
DEVICE FOR THE PRODUCTION OF ITEMS FROM SLAGS OF METALLURGICAL PRODUCTION (OPTIONS) | 2022 |
|
RU2802934C1 |
METHOD OF MANUFACTURING HEAT-INSULATING MINERAL WOOL PRODUCTS | 2014 |
|
RU2566164C1 |
METHOD OF PRODUCING THERMAL PHOSPHORIC ACID AND APPARATUS FOR REALISING SAID METHOD | 2009 |
|
RU2420452C1 |
METAL SCRAP HEATING METHOD | 2013 |
|
RU2552807C1 |
GAS AND ELECTRIC CUPOLA FURNACE (GECF) FOR THE NONMETALLIC MATERIALS MELTING | 2017 |
|
RU2652044C1 |
METHOD OF PRODUCING ALUMINIUM-SILICON ALLOYS AND SMELTING-REDUCING HEARTH FURNACE TO THIS END | 2011 |
|
RU2484165C2 |
METHOD FOR VITRIFICATION OF SLUDGE OR OTHER ORGANIC SLUDGES AND WASTES AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2704398C1 |
Authors
Dates
2015-04-10—Published
2012-06-08—Filed