FIELD: process engineering.
SUBSTANCE: proposed line incorporates extra first and second glass scrap distributors, two weighing mid bins equipped with output feeders and weighing conveyor of excess glass scrap. Said first glass scrap distributor and two weighing mid bins allow weighing the glass scrap fed from "cold" end and outputting a required linear density of said scrap on assembly belt. Second distributor allows at overfill of said bin with crushed glass scrap changing scrap flow over to weighing conveyor foe excess scrap to be discharged into temporary storage bin. Availability of store bin weighing system allows accounting of total amount of glass scrap at the line cold and hot ends.
EFFECT: higher efficiency of line operation.
1 dwg
Authors
Dates
2015-04-20—Published
2014-03-18—Filed