FIELD: power engineering.
SUBSTANCE: proposed plant comprises two replaceable horizontal nuclear reactors with displacing reflector. One reactor is operating while another one is either removed or kept ready for operation. Said reactors are connected in turn to circulation circuit. Core of every reactor is arranged inside the shell, all over its length. Displacing neutron reflector covers the working reactor shell to ensure fusion reaction in the core power generation and is notably shorter than said core. At operation of working reactor, recovery of reactivity margin wasted at fuel burn at core power generation section is ensured by reflector displacement to adjoining section of the core with "green" fuel and involving the latter to fusion process. For cooling purposes, heat carrier is forced the core in working reactor shell.
EFFECT: long service life without overloads.
4 cl, 3 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
HORIZONTAL REACTOR WITH DISPLACING NEUTRON REFLECTOR AND METHOD OF ITS OPERATION | 2013 |
|
RU2524397C1 |
METHOD OF NUCLEAR RECTOR OPERATION IN FUEL CYCLE WITH EXTENDED PRODUCTION OF FISSILE ISOTOPES | 2015 |
|
RU2601558C1 |
METHOD FOR NUCLEAR FUEL CYCLING IN GRAPHITE-MODERATED PRESSURIZED-TUBE REACTOR | 2002 |
|
RU2239247C2 |
OPERATING METHOD OF NUCLEAR REACTOR IN THORIUM FUEL CYCLE WITH EXTENDED REPRODUCTION OF ISOTOPE U | 2013 |
|
RU2541516C1 |
NUCLEAR REACTOR OF HEAT-SUPPLY UNIT AND METHOD (ALTERNATIVES) FOR AUTOMATIC POWER CONTROL OF HEAT-SUPPLY UNIT | 2006 |
|
RU2317602C2 |
METHOD FOR REALISATION OF FUEL CYCLE IN NUCLEAR CHANNEL-TYPE REACTOR | 2007 |
|
RU2347292C1 |
METHOD FOR CONTROLLING AND PROTECTING A FAST NEUTRON NUCLEAR REACTOR AND A SYSTEM FOR ITS IMPLEMENTATION | 2022 |
|
RU2798480C1 |
BALL FUEL ELEMENT OF NUCLEAR REACTOR | 1992 |
|
RU2080663C1 |
METHOD OF EXECUTING FUEL CYCLE OF CHANNEL-TYPE NUCLEAR REACTOR | 2013 |
|
RU2545029C2 |
NUCLEAR REACTOR FUEL ASSEMBLY | 2016 |
|
RU2717353C1 |
Authors
Dates
2015-04-20—Published
2013-09-17—Filed