FIELD: electricity.
SUBSTANCE: method is based on symbiosis of direct and indirect adaptation. According to the method three types of signals and, respectively, three polytypic groups of similar relays, and also groups of executive relays which include one representative from each group of similar relays are applied. The operations of training of the second type relays reacting to the current mode values, and the third type relay reacting to the virtual values formed with participation of emergency components of currents. The first type relays are not subject to training. Their characteristics are set rigidly, by splitting into parts of area of display of measurements formed from values of the previous mode. While the first type relays control the process of training of the second and third type relays that are in the same executive group.
EFFECT: higher reliability of protection.
6 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RELAY PROTECTION OF A POWER FACILITY | 2015 |
|
RU2594361C1 |
METHOD FOR RELAY PROTECTION OF REMOTE BACKUP | 2016 |
|
RU2638548C1 |
METHOD OF TRANSFORMER RELAY PROTECTION | 2016 |
|
RU2643779C1 |
METHOD OF RELAY PROTECTION OF ELECTRIC TRANSMISSION LINES AT DOUBLE-SIDED SUPERVISION | 2016 |
|
RU2647485C1 |
METHOD FOR RELAY PROTECTION OF AN ENERGY OBJECT | 2006 |
|
RU2316871C1 |
METHOD FOR RECOGNITION OF FAULTY PHASES OF ELECTRIC TRANSMISSION LINES IN OPEN-PHASE EARTH SHORT-CIRCUIT | 2016 |
|
RU2642506C1 |
METHOD FOR RELAY PROTECTION OF AN ENERGY OBJECT | 2006 |
|
RU2316872C1 |
METHOD OF INTERVAL FAULT LOCALIZATION IN POWER LINE | 2016 |
|
RU2639718C1 |
METHOD TO DETECT COMPLICATED DAMAGE OF ELECTRIC SYSTEM | 2010 |
|
RU2444829C1 |
METHOD OF RELAY PROTECTION FOR POWER FACILITY | 2010 |
|
RU2450402C2 |
Authors
Dates
2015-06-20—Published
2014-03-04—Filed