FIELD: construction.
SUBSTANCE: compressing element in the device is designed in the form of single row tamping beam with two equal by length left L1 and right L2 portions, constituting the total length of the beam L=L1+L2, moving vertically in opposite phases with the vibration frequency of ƒ=540-720 min-1 for mixes of type A, B and ƒ=420-600 min-1 for mixes of type C, D, E, beam width is determined from the condition C=(2-3)dmax, where dmax maximum size of mix grain, which permits to increase the moving rate of asphalt-spreader up to 8.0 m/min, its support surface comprises two portions different by width - front C1=0.55C and rear C2=0.45C, inclined to the horizontal surface of the compacted layer, respectively, at angles
EFFECT: possibility of increasing the speed of asphalt-spreader.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPACTING DEVICE OF ASPHALT LAYING MACHINE | 2014 |
|
RU2558568C1 |
ASPHALT SPREADER COMPACTING MEMBER | 1995 |
|
RU2078869C1 |
METHOD OF LAYING POROUS-MASTIC ASPHALT CONCRETE | 2018 |
|
RU2694323C1 |
METHOD AND DEVICE FOR REDUCING THE TEMPERATURE AND FRACTIONAL SEGREGATION OF THE ASPHALT-CONCRETE MIXTURE BY THE EQUIPMENT LOCATED ON THE PAVER | 2017 |
|
RU2649703C1 |
METHOD FOR USE OF MEGALOPOLIS HIGHWAY | 1998 |
|
RU2140479C1 |
ASPHALT SPREADER COMPACTING WORKING MEMBER | 2002 |
|
RU2225911C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR RECONSTRUCTION OF MEGAPOLICE RING HIGHWAY | 1998 |
|
RU2135672C1 |
MOTOR ROAD AND METHOD OF ITS OPERATION TOGETHER WITH REPAIR AND RECONSTRUCTION | 1998 |
|
RU2135671C1 |
WORKING MEMBER OF ASPHALT-LAYING MACHINE | 0 |
|
SU1446203A1 |
METHOD FOR CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT | 0 |
|
SU1636500A1 |
Authors
Dates
2015-06-27—Published
2014-04-10—Filed