FIELD: mining.
SUBSTANCE: method of excavation support, passed on the formations hazardous on rock burst, comprising fixing the dome of working with combined support consisting of anchor and frame timbering. At that the anchors lower in the row using a clamp with the holes press the frame support rack to the array. Between the array and the clamp on the anchors a collapsible member is placed. The anchors are located at an α angle to the horizontal plane and they are fixed in a rock layer, which is the continuation of the drift floor. The α angle is determined by the formula grade, where la is the active length of the anchor, m; b is the distance from the drift floor to the place of mounting the anchor, m; h is the depth of immediate bottom, m.
EFFECT: increase and providing sustainability of working, passed through the formation, hazardous on rock bursts, with a view of minimizing the consequences of destruction as a result of rock burst.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINE WORKING PROTECTION WITH HELP OF ROCK MASS YIELDING SYSTEM | 2002 |
|
RU2212543C1 |
METHOD FOR CONDUCTING MINING WORKS IN DEVELOPMENT OF FLAT COAL BEDS | 2022 |
|
RU2805691C1 |
METHOD OF MINE WORKING BOLTING | 1999 |
|
RU2160837C2 |
METHOD OF GUARDING OF WORKINGS IN HEAVING SOILS | 1990 |
|
RU2007577C1 |
METHOD FOR SUPPORTING JUNCTIONS OF UNDERGROUND WORKINGS | 1996 |
|
RU2116454C1 |
PROCESS OF WORKING OF COAL SEAMS | 1998 |
|
RU2164293C2 |
METHOD FOR SUPPORTING MINE WORKINGS WITH COMBINED SUPPORT | 1992 |
|
RU2032078C1 |
METHOD FOR SUPPORTING MINING WORKINGS WITH LOOSE ROOF ROCK BY ANCHOR SUPPORT | 1997 |
|
RU2128773C1 |
METHOD FOR DRIVING UNDERGROUND WORKING AND ITS FRAMED SUPPORT | 1990 |
|
RU2084634C1 |
METHOD FOR MINE LINING | 2004 |
|
RU2308599C2 |
Authors
Dates
2015-08-20—Published
2014-06-16—Filed