FIELD: mining industry. SUBSTANCE: method involves initial erection of anchor support followed by installation of frame support. The latter is installed at the moment when the anchored rocks become displaced by 0.6-0.65 of the maximum permissible displacement value with an outward thrust equal to 0.9-1.0 of anchor support tension. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SUPPORTING JUNCTIONS OF UNDERGROUND WORKINGS | 1996 |
|
RU2116454C1 |
METHOD FOR SUPPORTING MINING WORKINGS WITH LOOSE ROOF ROCK BY ANCHOR SUPPORT | 1997 |
|
RU2128773C1 |
METHOD OF MINE WORKING BOLTING | 1999 |
|
RU2160837C2 |
METHOD FOR RECONDITIONING AND SUPPORTING OF WORKINGS CAVED WITH ENCLOSING ROCKS | 1990 |
|
RU2005882C1 |
METHOD FOR PROTECTION OF REUSED WORKINGS | 1991 |
|
RU2013546C1 |
CABLE ANCHOR | 1999 |
|
RU2178082C2 |
METHOD OF SUPPORTING MINE WORKINGS IN ADJACENT COAL SEAMS | 1999 |
|
RU2167301C1 |
METHOD FOR SUPPORT OF MINE WORKINGS | 1992 |
|
RU2042032C1 |
METHOD OF SUPPORTING MINE WORKINGS WITH FILLING-UP OF BEYOND-SUPPORT SPACE | 0 |
|
SU1262046A1 |
METHOD OF FIXING OF ANCHOR AND DESIGN OF ANCHOR | 1999 |
|
RU2175063C2 |
Authors
Dates
1995-03-27—Published
1992-02-06—Filed