FIELD: blasting operations.
SUBSTANCE: explosive device is delivered under the object to be exploded by the plant of horizontal directional drilling (HDD) through the drilled hole. The delivery method of the explosive devices by the plant of horizontal directional drilling comprises the construction of horizontal directional well under the object to be exploded and drilling operations from behind the safe shelter. Delivery of the explosive device under the object to be exploded is carried out by using a drill string consisting of drill pipes, an expander, a string disconnector and a swivel.
EFFECT: increased protection of the crew.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DELIVERY OF EXPLOSIVE DEVICES USING HORIZONTALLY DIRECTED DRILLING UNIT | 2014 |
|
RU2566355C1 |
METHOD OF EXPLOSIVE DEVICES DELIVERY BY MEANS OF HORIZONTAL DIRECTIONAL DRILLING DEVICE AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2705439C1 |
METHOD OF PROTECTIVE SLEEVES INSTALLATION IN HORIZONTAL HOLE UNDER WATER OR OTHER BARRIERS | 2014 |
|
RU2561399C1 |
BUILT-UP STRUCTURE FOR PULLING THROUGH PIPELINES IN WELLS MADE BY METHOD OF HORIZONTAL DRILLING IN UNSTABLE EARTH | 2009 |
|
RU2428544C2 |
DEVICE FOR DIRECTIONAL EXPANSION OF A PILOT WELL | 2022 |
|
RU2778870C1 |
METHOD TO CONTROL BALLASTING OF PIPELINE PULLED IN HORIZONTAL WELL UNDER WATER AND OTHER NATURAL OBSTACLES BY HORIZONTAL DRILLING PLANT | 2008 |
|
RU2384673C2 |
SYSTEM FOR MONITORING THE PROFILE OF THE BOTTOM OF A BOREHOLE AT THE STAGES OF EXPANSION WHEN BUILDING COMMUNICATIONS BY THE HORIZONTAL DIRECTIONAL DRILLING METHOD | 2021 |
|
RU2771433C1 |
METHOD FOR PIPELINE DRAWING THROUGH HORIZONTAL WELL UNDER WATER AND OTHER NATURAL OBSTACLES | 2005 |
|
RU2323304C2 |
PIPELINE PULLING METHOD IN HORIZONTAL WELL | 2019 |
|
RU2734198C1 |
METHOD FOR REDUCTION OF TORSION TORQUES OF DRILLING RIG AT STAGES OF PRELIMINARY WELL EXPANSION AND IN PROCESS OF WELL PREPARATION OF PIPELINE DRAGGING | 2008 |
|
RU2399742C2 |
Authors
Dates
2015-10-27—Published
2014-05-23—Filed