FIELD: mining.
SUBSTANCE: claimed method comprises installation serviceability test for all special software systems of automated complex. Computer-aided control system designed to solve the objectives of said automated complex is parameterized in compliance with available parameters of deposit development object. Working cycle control comprises the adjustment of intake reservoirs turn control system meant for intake and feed of rock into sieving surface. Hydraulic cylinder control system is adjusted. System for control over rock mass feeder drive control is adjusted for feed of said mass from sieving surface. System for control over auto-oscillation dynamics control is adjusted to auto-oscillations of sieving surface actuated by vibrator and for uniform feed of rock via fire bars onto the feeder. System for control over sieving surface turn is adjusted for intermittent turn actuated by turn drive and feed of large lump inclusions in the zone of piling. Note here that claimed computer-based system is operated with the help of video control system and control transducers including those for dump truck position control at positioning relative to intake reservoirs.
EFFECT: higher efficiency or preparation and transportation, reliable control thereof.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMING DUMPS WITH SEPARATION OF ENRICHED FINE FRACTION | 2023 |
|
RU2809406C1 |
METHOD OF COMBINED DEVELOPMENT OF DEPOSITS OF SOLID MINERALS | 2017 |
|
RU2653213C1 |
EQUIPMENT SET FOR FILLING OF HIGH DUMPS WITH USE OF AUTOMOBILE TRANSPORT | 2000 |
|
RU2168021C1 |
METHOD OF OPEN DEVELOPMENT OF DEPOSITS OF SOLID MINERAL RESOURCES | 2014 |
|
RU2558051C1 |
METHOD FOR DIFFERENTIATED AUTOMATED LOADING OF MINED ROCK INTO DUMP-TRUCKS DURING CONTINUOUS OPERATION OF EXTRACTION UNIT AND AUTOMATED SYSTEM FOR REALISING SAID METHOD | 2015 |
|
RU2595115C1 |
METHOD FOR DEVELOPMENT OF COMPLEX-STRUCTURE SOLID MINERAL DEPOSITS | 2019 |
|
RU2714420C1 |
METHOD FOR OPEN PIT MINING OF MINERAL DEPOSITS | 2016 |
|
RU2645051C2 |
METHOD OF AUTOMATIC, ENVIRONMENTALLY PURE MINERAL PRODUCTION BY OPEN DEVELOPMENT IN THE QUARRY | 2017 |
|
RU2653144C1 |
SCREENING AND CRUSHING STATION | 0 |
|
SU1424873A1 |
CRUSHING-AND-TRANSFERRING COMPLEX IN OPENCAST | 0 |
|
SU1760117A1 |
Authors
Dates
2015-11-20—Published
2014-11-14—Filed