FIELD: physics, computer engineering.
SUBSTANCE: group of inventions relates to a method and apparatus for managing a data centre for simulating nonstandard operation of a data centre element. The method comprises steps of determining one data centre resource affected by a data centre element, selecting a simulator based on the data centre resource and the data centre element and generating an impact analysis of the nonstandard operation of the data centre element using the simulator, wherein generation of the analysis includes determining a second data centre element affected by the nonstandard operation of the first data centre element.
EFFECT: high efficiency of simulating nonstandard operation of a data centre element.
20 cl, 1 tbl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND AUTOMATED SYSTEM FOR SOLVING PROBLEMS | 2020 |
|
RU2744767C1 |
INTELLECTUAL GRID-SYSTEM FOR HIGHLY EFFICIENT DATA PROCESSING | 2009 |
|
RU2411574C2 |
DRILLING RIG CONTROL SYSTEM | 2016 |
|
RU2667545C1 |
SYSTEM FOR MODELING SITUATIONS RELATING TO CONFLICTS AND/OR COMPETITION | 2015 |
|
RU2665045C2 |
SERVICE PERFORMANCE MANAGER WITH OBLIGATION-BOUND SERVICE LEVEL AGREEMENTS AND PATTERNS FOR MITIGATION AND AUTOPROTECTION | 2009 |
|
RU2526711C2 |
VISUAL TOOLS FOR FAILURE ANALYSIS IN DISTRIBUTED SYSTEMS | 2015 |
|
RU2696347C2 |
METHOD FOR DIAGNOSING AND MONITORING ANOMALIES IN A CYBER-PHYSICAL SYSTEM | 2021 |
|
RU2784981C1 |
PROTECTION OF WEB APPLICATIONS WITH INTELLIGENT NETWORK SCREEN WITH AUTOMATIC APPLICATION MODELING | 2017 |
|
RU2659482C1 |
METHOD AND SYSTEM OF MACHINE CONTROL | 2017 |
|
RU2727839C2 |
DYNAMIC WINDOW ARCHITECTURE | 2004 |
|
RU2377663C2 |
Authors
Dates
2015-11-27—Published
2010-12-02—Filed