FIELD: mining.
SUBSTANCE: invention can be used in artificial ventilation of dead zones of deep pits. Pit ventilation method involves arrangement in pit and outside of air pipeline channels and flooding of heat exchange sections of these channels in adjoining to natural water source carrier, heat preparation of air inside flooded channels with change of its temperature to temperature of water, arrangement of air exchange of pit atmosphere with environment at air pipeline channels by means of sources of power and control of aerodynamic air flow parameters in channels. Pit atmosphere air exchange with ambient medium in cold season is performed by injection in lower zone of pit of heated inside flooded fresh air channels, and control of aerodynamic air flow parameters in channels is performed by release of part of injected air via air valves, air distribution systems mounted in upper part of pit.
EFFECT: proposed solution is increased efficiency of power action means to air ventilation pool pit at energy deficiency instability inside pit atmosphere.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ARTIFICIAL VENTILATION OF OPENCASTS | 2002 |
|
RU2215157C1 |
VERTICAL WIND TUNNEL OF CLOSED RECIRCULATION TYPE FOR SIMULATION OF FREE FLOATING OF A PERSON IN AIR | 2018 |
|
RU2692744C1 |
METHODFOR VENTILATION OF DEEP QUARRIES | 2023 |
|
RU2797568C1 |
METHOD OF VENTILATION OF CAREERS | 2017 |
|
RU2651670C1 |
METHOD FOR VENTILATION OF DEEP OPEN PITS | 2021 |
|
RU2760181C1 |
SOLAR HEAT AND COLD SUPPLY SYSTEM WITH QUALITY AIR EXCHANGE IN BUILDINGS | 2013 |
|
RU2544403C1 |
PIT VENTILATION METHOD | 2011 |
|
RU2460885C1 |
PIT VENTILATION METHOD | 2019 |
|
RU2716066C1 |
DEEP PIT VENTILATION METHOD | 2014 |
|
RU2581644C1 |
METHOD OF AERODYNAMIC PROFILING OF EDGES OF OPEN PITS AND COAL STRIP MINES | 2013 |
|
RU2539086C1 |
Authors
Dates
2016-04-27—Published
2015-04-07—Filed