FIELD: construction.
SUBSTANCE: device for increasing lateral stability of assembled rails and sleepers section contains ballast prism and retaining structure in the form of anchor. Retaining structure comprises a geogrid, consisting of vertical and horizontal planes, interconnected at the angle of 90 degrees. Vertical plane is parallel to track axis with its outer side. Horizontal plane is located on the main platform of road bed. On vertical surface of geodrid there are fibre-glass rods evenly arranged along the length fixed by means of loops made by ultrasonic spot welding.
EFFECT: simplified retaining structure and elimination of corrosive elements.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
FIXING BLOCK FOR SECURING DIAGRAM OF SLEEPERS OF RAILWAY TRACK FOR HIGH-SPEED NETWORKS, LONG-DISTANCE AND HEAVY TRAIN TRAFFIC | 2020 |
|
RU2751167C1 |
METHOD OF VOLUMETRIC COMPACTION OF TRACK BALLAST SECTION | 2009 |
|
RU2400589C1 |
DEVICE INTENDED FOR IMPROVING LATERAL STABILITY OF RAIL-AND-SLEEPER GRID IN BALLAST (VERSIONS) | 2007 |
|
RU2339756C1 |
RAILWAY TRACK LINK | 2017 |
|
RU2657709C1 |
RAILWAY RAIL LENGTH (VERSIONS) | 2007 |
|
RU2381317C2 |
OUTHANG OF SLEEPER | 2017 |
|
RU2646703C1 |
ANCHOR RAIL FASTENING | 2020 |
|
RU2744086C1 |
METHOD OF SEALING RAILWAY BALLAST | 2018 |
|
RU2676253C1 |
METHOD FOR INCREASING LATERAL STABILITY OF RAIL TRACK ON BALLAST BASE | 2018 |
|
RU2701635C1 |
SHILKIN'S METHOD FOR CONSOLIDATION OF BALLAST OF RAIL WAY AND SHILKIN'S MACHINE FOR REALISATION OF METHOD (VERSIONS) | 2007 |
|
RU2342481C1 |
Authors
Dates
2016-05-27—Published
2014-12-15—Filed