FIELD: transport.
SUBSTANCE: proposed method comprises complete cutting-out of ballast, its cleaning, filling lower layer to be leveled and compacted, filling new layer of breakstone thereon. Compaction of ballast lower layer is carried out by vertical static and dynamic effects brought about by wedge-like compactors on ballast surface in zones between sleepers. Said wedge-like compactors are mounted on breakstone cleaning or special ballast-compacting machine. New layer of breakstone is compacted by hammering machine and dynamic stabiliser that transfers vibration onto assembled rails and sleepers and onto breakstone ballast.
EFFECT: higher stability of track.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
FORMATION AND COMPACTION METHOD OF BALLAST SECTION OF RAILWAY | 2014 |
|
RU2545133C1 |
METHOD FOR STRENGTHENING THE MAIN PLATFORM OF THE RAILWAY ROADBED | 2021 |
|
RU2766844C1 |
METHOD FOR RECOVERY OF BALLAST SECTION | 2015 |
|
RU2579246C1 |
METHOD TO REINFORCE RAILWAY TRACK | 2010 |
|
RU2448212C2 |
METHOD TO REPAIR UNDERBALLAST LAYER OF RAILWAY TRACK | 2010 |
|
RU2422579C1 |
MACHINE TO LAY GEOSYNTHETIC MATERIALS INTO UNDERBALLAST LAYER OF RAILWAY GROUND WORK WITHOUT REMOVAL OF RAIL AND SLEEPER GRID | 2010 |
|
RU2477349C2 |
METHOD TO RESTORE UNDERBALLAST LAYER OF RAILWAY TRACK | 2010 |
|
RU2422578C1 |
CRUSHED-STONE CLEANING MACHINE | 1996 |
|
RU2107123C1 |
BULK GEOGRID LAYING MACHINE | 2012 |
|
RU2521171C2 |
METHOD FOR AUTOMATIC QUALITY CONTROL OF RAIL TRACK BALLAST LAYER SEAL AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2703819C1 |
Authors
Dates
2010-09-27—Published
2009-06-15—Filed