FIELD: transport construction.
SUBSTANCE: invention can be used in the construction and reconstruction of subgrade railways and roads. The culvert with the use of bar structures of a multifaceted structure is located on a crushed stone base, holding it in the design position, crosses the subgrade of the embankment in the transverse direction and consists of bar structures of a multifaceted structure in the form of an octahedron adjacent to each other, sequentially laid along the axis of the structure, the main elements of which are tubular rods, which are beams with a given cross section and perform the functions of structural ribs, and nozzle caps, made in the form of a ball with holes for fastening the rods, performing the functions of structural nodes. A protective layer of text concrete was laid on the upper and side surfaces of the culvert part of the structure from the side of the embankment.
EFFECT: improved culvert properties of the structure in the body of the subgrade of the embankment.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CULVERT WITH A CELLULAR STRUCTURE WITH A MINIMUM SURFACE | 2020 |
|
RU2757452C1 |
SPILLOVER ON PERMAFROST SOILS | 2014 |
|
RU2567248C1 |
GROUND GABION | 1997 |
|
RU2131493C1 |
FILTERING EMBANKMENT ON SOFT GROUND | 2000 |
|
RU2186170C1 |
SLOPE PART OF ROAD EMBANKMENT ON PERMAFROST | 2023 |
|
RU2819378C1 |
CULVERT UNDER BANKED EARTH IN CONDITIONS OF PERMANENTLY FROZEN GROUNDS IN PERIODIC WATER COURSE | 2008 |
|
RU2381327C1 |
MOTOR ROAD | 2023 |
|
RU2800165C1 |
ROAD STRUCTURE ON WEAK BASE FOR ROADS | 2015 |
|
RU2585302C1 |
CULVERT IN CONDITIONS OF PERMANENTLY FROZEN SOILS ON PERIODIC WATER COURSE | 2008 |
|
RU2375519C1 |
METHOD OF STRENGTHENING ROAD BED OF AUTOMOBILE ROADS IN PLACES OF CULVERTS | 2018 |
|
RU2674783C1 |
Authors
Dates
2023-05-17—Published
2022-04-27—Filed