FIELD: construction.
SUBSTANCE: invention relates to building of reservoirs, in particular, to erection of large steel vertical tanks for storage of oil and oil products on weak soils. Foundation for vertical steel reservoir consists of piles and a reinforced concrete plate. Lower part of the reinforced concrete plate has recesses representing segments of spheres, located along the whole area of the reinforced concrete plate in several rows. Piles are rigidly connected with the reinforced concrete plate and are located at points of intersection of three segments of spheres and represent truncated quadrangular pyramids arranged with preliminary soil forging.
EFFECT: increased carrying capacity of the foundation, ensuring of uniform distribution of loads between the piles and the reinforced concrete plate or grill, reduction of material consumption.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ERECTING FOUNDATION | 2016 |
|
RU2626479C1 |
METHOD TO ERECT PILED RAFTS | 2013 |
|
RU2548461C1 |
METHOD OF STRENGTHENING FOUNDATION AT RECONSTRUCTION | 2016 |
|
RU2633619C1 |
SINGLE-PILE-SLABBY FOUNDATION | 2016 |
|
RU2638664C2 |
METHOD FOR CONSTRUCTION OF PILE FOUNDATION | 2015 |
|
RU2581853C1 |
SLAB-AND-PILE FOUNDATION | 2005 |
|
RU2301303C2 |
METHOD FOR PLATE-PILE FOUNDATION CONSTRUCTION | 2016 |
|
RU2616633C1 |
PILE-SLAB FOUNDATION AND METHOD OF ITS CONSTRUCTION | 2000 |
|
RU2163281C1 |
METHOD FOR CONSTRUCTION OF PILE-PLATE FOUNDATION | 2021 |
|
RU2774443C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2008 |
|
RU2378454C1 |
Authors
Dates
2016-10-10—Published
2015-03-06—Filed