FIELD: construction.
SUBSTANCE: road marking laying method consists in forming the lower layer of asphalt concrete layer of the roadway platform. After that, a geogrid is laid and beacons are installed. The geogrid is then raised to the desired level and fixed with beacons. The top layer of the asphalt concrete pavement is formed in such a way as to form cavities corresponding to dimensions of road marking elements, which is filled with a construction mixture of a different colour.
EFFECT: better road safety, improved self-descriptiveness of pedestrian crossings, dividing lines and zones for comfortable movement of pedestrians and vehicles, with better service life of the marking.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR LAYING MARKINGS ON PEDESTRIAN CROSSINGS | 2022 |
|
RU2788720C1 |
PAVING AND METHOD OF ITS LAYING | 2016 |
|
RU2639205C1 |
METHOD OF PREPARATION FOR STORAGE AND USAGE OF BULK GEOGRID | 2012 |
|
RU2530136C2 |
GEOLOGICAL REINFORCING INTERLAYER ( VARIANTS ) | 2001 |
|
RU2186906C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR RECONSTRUCTION OF MEGAPOLICE RING HIGHWAY | 1998 |
|
RU2135672C1 |
MOTOR ROAD AND METHOD OF ITS OPERATION TOGETHER WITH REPAIR AND RECONSTRUCTION | 1998 |
|
RU2135671C1 |
MULTILAYER MAT FOR DEVICE OF ROAD EMBANKING AND METHOD FOR ITS MANUFACTURE | 2023 |
|
RU2802766C1 |
METHOD FOR ENHANCING ROAD SUBGRADE | 2013 |
|
RU2529994C1 |
METHOD FOR USE OF MEGALOPOLIS HIGHWAY | 1998 |
|
RU2140479C1 |
METHOD FOR CREATING SUPPORT STRUCTURE OF PAVEMENT | 2020 |
|
RU2747181C1 |
Authors
Dates
2017-03-02—Published
2016-03-31—Filed