FIELD: mining engineering.
SUBSTANCE: method includes cutting of inclined slots on a slope and horizontal slots on a working platform by a working member of a disc-cutting excavator with milling cutters installed parallel to each other. Independent periodic and asynchronous superposition of oscillations to each of the milling cutters is carried out separately by means of vibration mechanisms, which frequency and amplitude oscillations are transferred depending on inclination angle of a telescopic rod, directions of cutting force by the milling cutters and physico-mechanical properties of rock controlled by sensors of automatic process control system and control of working systems of the disc-milling excavator. The adjustment of the milling cutters positioning with respect to each other is carried out along the guides by means of hydraulic mechanism.
EFFECT: increased performance, reliability and process efficiency of frozen rock softening.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SOFTENING SURFACE LAYER OF PIT OPENINGS DURING SEASONAL FREEZING OF ROCK | 2018 |
|
RU2687720C1 |
WORKING EQUIPMENT OF HYDRAULIC EXCAVATOR | 2008 |
|
RU2380487C1 |
HYDRAULIC EXCAVATOR FRONT-END EQUIPMENT | 2001 |
|
RU2187600C1 |
HYDRAULIC EXCAVATOR WORKING EQUIPMENT | 2019 |
|
RU2720039C1 |
METHOD OF SOFTENING OF SURFACE LAYER OF OPENCAST BENCHES IN SEASONAL GROUND FREEZING | 2001 |
|
RU2187647C1 |
METHOD FOR DEVELOPMENT OF COMPLEX-STRUCTURE DEPOSITS OF SOLID MINERAL DEPOSITS | 2019 |
|
RU2715498C1 |
METHOD OF DEVELOPMENT OF SOLID ROCKS | 2017 |
|
RU2645702C1 |
METHOD OF PREPARING BLOCKS OF ACTIVE CLIMATIC ACTION FOR EXCAVATION | 2017 |
|
RU2678254C2 |
METHOD OF OPEN-PIT MINING | 1996 |
|
RU2098627C1 |
METHOD FOR OPEN EXTRACTION OF MINERAL RESOURCE DEPOSITS | 2005 |
|
RU2304720C1 |
Authors
Dates
2017-10-24—Published
2016-10-04—Filed