METHOD OF CONTROL OF THE STRESS AND STRAIN STATE OF STRUCTURAL COMPONENTS OF MASSIVE CONCRETE STRUCTURES DURING LONG-TERM USAGE Russian patent published in 2018 - IPC G01M7/00 

Abstract RU 2645903 C1

FIELD: test and measurement equipment.

SUBSTANCE: invention relates to the field of test and measurement equipment and can be used in the monitoring of massive concrete structures. Method includes the creation of computer models of a structure, load models and impacts on it, performance calculation of load carrying structures, acquisition of data from control and measuring equipment, data of field studies of control and measuring equipment, such as embedded strainmeter, are reconstructed according to the developed statistical model using the calculated magnitude of voltage at local points of a massive concrete structure, obtained on the simulation mathematical model, calibrated for the values of the integral diagnostic indicators of the structure, and observations of the structure during the period, prior to the failure of the control and measuring equipment.

EFFECT: technical result is to ensure the monitoring of voltages in the event of failure control and measuring equipment and increasing the reliability of structural components of buildings.

1 cl, 5 dwg

Similar patents RU2645903C1

Title Year Author Number
METHOD OF PREDICTION OF EARTHQUAKES 1992
  • Marchuk A.N.
  • Durcheva V.N.
  • Savich A.I.
  • Malyshev L.I.
  • Radkevich D.B.
RU2068185C1
METHOD FOR DETERMINING DYNAMIC CHARACTERISTICS OF BASE AND BODY OF HYDRAULIC STRUCTURE DAM 1998
  • Seleznev V.S.
  • Emanov A.F.
  • Baryshev V.G.
  • Kuz'Menko A.P.
  • Bakh A.A.
RU2151233C1
METHOD OF REGISTRATION OF PRESSENT-DAY TECTONIC MOVEMENTS 1992
  • Marchuk A.N.
  • Durcheva V.N.
  • Savich A.I.
  • Malyshev L.I.
  • Radkevich D.B.
RU2067307C1
METHOD FOR DETERMINING DYNAMIC CHARACTERISTICS OF BASE AND BODY OF DAM AT HYDROELECTRIC POWER STATION BY MEASURING PULSES BUILT UP WHEN STARTING HYDROPOWER UNITS 1998
  • Seleznev V.S.
  • Emanov A.F.
  • Kuz'Menko A.P.
  • Baryshev V.G.
  • Saburov V.S.
RU2151234C1
PROCESS OF REDUCTION OF MEASUREMENT RECORDINGS TAKEN AT DIFFERENT TIMES TO COMMON TIME 1998
  • Seleznev V.S.
  • Emanov A.F.
  • Kuz'Menko A.P.
  • Baryshev V.G.
  • Saburov V.S.
RU2150684C1
METHOD AND DEVICE FOR EXTRACTING INFORMATION ON STRESSED-DEFORMED CONDITION OF WATER-DEVELOPMENT WORKS 2004
  • Shajdurov Georgij Jakovlevich
  • Gondarev Viktor Viktorovich
  • Mjakotin Grigorij Samuilovich
  • Veretnov Aleksandr Leonidovich
  • Lobanov Al'Bert Efimovich
  • Koreshnikov Ivan Anatol'Evich
RU2280846C1
METHOD OF SCHEDULED PREVENTIVE TEST OF PHYSICAL STATE OF BUILDINGS AND STRUCTURES 1999
  • Seleznev V.S.
  • Emanov A.F.
  • Kuz'Menko A.P.
  • Baryshev V.G.
  • Danilov I.A.
RU2163009C2
PROCESS OF REPAIR OF MULTISECTIONAL CONCRETE DAM 2000
  • Jagin V.P.
  • Permjakova L.S.
  • Bulatov V.A.
RU2200220C2
COMPREHENSIVE METHOD FOR MONITORING STRESS-STRAIN STATE OF STRUCTURAL ELEMENTS OF GEOTECHNOLOGY OBJECTS DURING THEIR LONG-TERM OPERATION 2022
  • Baryshnikov Vasilii Dmitrievich
  • Khmelinin Aleksei Pavlovich
  • Baryshnikov Dmitrii Vasilevich
RU2796197C1
METHOD TO INCREASE RELIABILITY OF CONCRETE ARC-GRAVITY DAM IN OPERATION 2010
  • Jagin Vasilij Petrovich
RU2418911C1

RU 2 645 903 C1

Authors

Ginzburg Sofya Mikhajlovna

Shcherba Dmitrij Valentinovich

Evstifeev Aleksej Dmitrievich

Kostylev Vladimir Sergeevich

Skvortsova Anna Evgenevna

Dates

2018-02-28Published

2016-11-08Filed