FIELD: test and measurement equipment.
SUBSTANCE: invention relates to the field of test and measurement equipment and can be used in the monitoring of massive concrete structures. Method includes the creation of computer models of a structure, load models and impacts on it, performance calculation of load carrying structures, acquisition of data from control and measuring equipment, data of field studies of control and measuring equipment, such as embedded strainmeter, are reconstructed according to the developed statistical model using the calculated magnitude of voltage at local points of a massive concrete structure, obtained on the simulation mathematical model, calibrated for the values of the integral diagnostic indicators of the structure, and observations of the structure during the period, prior to the failure of the control and measuring equipment.
EFFECT: technical result is to ensure the monitoring of voltages in the event of failure control and measuring equipment and increasing the reliability of structural components of buildings.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREDICTION OF EARTHQUAKES | 1992 |
|
RU2068185C1 |
METHOD FOR DETERMINING DYNAMIC CHARACTERISTICS OF BASE AND BODY OF HYDRAULIC STRUCTURE DAM | 1998 |
|
RU2151233C1 |
METHOD OF REGISTRATION OF PRESSENT-DAY TECTONIC MOVEMENTS | 1992 |
|
RU2067307C1 |
METHOD FOR DETERMINING DYNAMIC CHARACTERISTICS OF BASE AND BODY OF DAM AT HYDROELECTRIC POWER STATION BY MEASURING PULSES BUILT UP WHEN STARTING HYDROPOWER UNITS | 1998 |
|
RU2151234C1 |
PROCESS OF REDUCTION OF MEASUREMENT RECORDINGS TAKEN AT DIFFERENT TIMES TO COMMON TIME | 1998 |
|
RU2150684C1 |
METHOD AND DEVICE FOR EXTRACTING INFORMATION ON STRESSED-DEFORMED CONDITION OF WATER-DEVELOPMENT WORKS | 2004 |
|
RU2280846C1 |
METHOD OF SCHEDULED PREVENTIVE TEST OF PHYSICAL STATE OF BUILDINGS AND STRUCTURES | 1999 |
|
RU2163009C2 |
PROCESS OF REPAIR OF MULTISECTIONAL CONCRETE DAM | 2000 |
|
RU2200220C2 |
COMPREHENSIVE METHOD FOR MONITORING STRESS-STRAIN STATE OF STRUCTURAL ELEMENTS OF GEOTECHNOLOGY OBJECTS DURING THEIR LONG-TERM OPERATION | 2022 |
|
RU2796197C1 |
METHOD TO INCREASE RELIABILITY OF CONCRETE ARC-GRAVITY DAM IN OPERATION | 2010 |
|
RU2418911C1 |
Authors
Dates
2018-02-28—Published
2016-11-08—Filed