BOILER HOUSE Russian patent published in 2018 - IPC F24D3/00 F24D17/00 

Abstract RU 2652499 C1

FIELD: heat-and-power engineering.

SUBSTANCE: invention relates to the field of heat-and-power engineering and can be used in hot water boilers to cover the hot water demand during the non-heating period. Boiler house contains at least one hot water boiler, supply and return network mains pipelines, supply and return hot water pipelines, water-to-water heat exchanger, connected by heating medium lines between the delivery water supply and return pipelines and by heated medium pipelines between return and supply hot water pipelines, delivery water pump, circulation pump, make-up pumps, control crossover pipe connecting delivery water return and supply pipelines, and chemical water purification plants connected with delivery water and hot water return pipelines through make-up pumps, the boiler house being additionally equipped with a heat pump system, while the evaporator of the heat pump system is connected to the delivery water supply pipeline after the control crossover pipe, and the condenser of the heat pump system is connected, after the circulation pump, between the return and supply hot water pipelines.

EFFECT: this makes it possible to reduce fuel consumption for hot-water boilers during the non-heating period by using low-potential thermal energy from the heating carrier circulating in a closed circuit of the heat supply network.

1 cl, 1 dwg

Similar patents RU2652499C1

Title Year Author Number
HOT WATER SUPPLY SYSTEM 2020
  • Kobylkin Mikhail Vladimirovich
  • Rikker Iuliia Olegovna
  • Batukhtin Andrei Gennadevich
  • Batukhtin Sergei Gennadevich
RU2793831C2
HOT WATER SUPPLY METHOD 2013
  • Batukhtin Andrej Gennad'Evich
  • Kobylkin Mikhail Vladimirovich
  • Batukhtin Sergej Gennad'Evich
RU2561846C2
METHOD FOR DEEP UTILIZATION OF LOW-POTENTIAL HEAT OF COMBUSTION PRODUCTS USING AN ABSORPTION THERMAL TRANSFORMER WITH TWO-STEP ABSORPTION 2020
  • Stepanov Konstantin Ilich
  • Mukhin Dmitrij Gennadevich
RU2736965C1
METHOD FOR HEAT AND COLD SUPPLY USING AN ABSORPTION THERMOTRANSFORMER WITH TWO-STAGE ABSORPTION 2020
  • Stepanov Konstantin Ilich
  • Mukhin Dmitrij Gennadevich
RU2755501C1
STEAM-TURBINE PLANT 2001
  • Arbuzov M.G.
  • Murat S.G.
  • Tkachev E.B.
  • Shelomkov V.S.
  • Kirjukhin A.A.
  • Kruglov G.D.
RU2192547C1
OPERATING METHOD OF HOT-WATER BOILER 2019
  • Novichkov Sergej Vladimirovich
  • Rostuntsova Irina Alekseevna
RU2716202C1
METHOD FOR IMPROVING THE ENERGY EFFICIENCY OF A STEAM POWER PLANT AND A DEVICE FOR ITS IMPLEMENTATION 2021
  • Sterligov Vladislav Viktorovich
  • Drobyshev Vladislav Konstantinovich
  • Sterligov Mark Vladislavovich
  • Pulikov Pavel Sergeevich
RU2778190C1
AIR HEATING SYSTEM FOR FUEL-BURNING PLANT 2015
  • Batukhtin Andrej Gennadevich
  • Kobylkin Mikhail Vladimirovich
  • Batukhtin Sergej Gennadevich
  • Ivanov Sergej Anatolevich
RU2601401C1
CONDENSATION BOILER PLANT (VERSIONS) 2012
  • Gorshkov Valerij Gavrilovich
RU2489643C1
SINGLE PIPE HEAT SUPPLY SYSTEM 2006
  • Protsenko Valentin Prokof'Evich
RU2320930C1

RU 2 652 499 C1

Authors

Batukhtin Andrej Gennadevich

Ivanov Sergej Anatolevich

Kobylkin Mikhail Vladimirovich

Rikker Yuliya Olegovna

Baranovskaya Marina Gennadevna

Batukhtin Sergej Gennadevich

Dates

2018-04-26Published

2017-03-29Filed