FIELD: gas industry.
SUBSTANCE: invention relates to the field of gas industry, in particular to objects of the main gas pipeline, and can be used to reduce natural gas losses during operation of the condensate collection unit of the process gas purification system of a compressor station. In the current scheme of the condensate collection unit of the process gas purification system of the compressor station, which includes two technologically interconnected underground tanks, tied with pipeline fittings using high and low pressure pipelines, according to the invention, a high pressure gas outlet pipe is installed with pipeline and shut-off and control valves between the purge gas pipeline of the first underground condensate collection tank and the inlet gas pipeline to the fuel and start-up gas unit; low pressure gas outlet pipe was installed with pipeline and shut-off and control valves between the purge gas pipeline of the second underground condensate collection tank and the inlet gas pipeline to the gas heater burner unit; tap is installed with shut-off and control valves between the low-pressure gas pipeline and the low-pressure gas burner unit and the inlet gas pipeline to the hot-water boiler burners unit of the backup boiler house.
EFFECT: object of the invention is resource saving due to the economy of natural gas, which instead of being vented to the atmosphere from two underground condensate collection tanks, technologically interconnected, is used to supply high-pressure gas as an input gas to the fuel and start-up gas unit for its own technological needs of the compressor shop and as low-pressure fuel gas for gas heater burner units and hot water boilers of the backup boiler compressor station.
1 cl, 1 dwg, 3 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COST-FREE PURGE OF GAS TREATMENT UNITS | 2023 |
|
RU2808153C1 |
METHOD FOR PRODUCTION OF NATURAL GAS FROM ADJACENT TO COMPRESSOR STATION SECTIONS OF MAIN GAS LINE BEFORE THEIR OUTPUT FOR REPAIR | 2019 |
|
RU2710106C1 |
METHOD OF CLEANING OF AIR-COOLING APPARATUS AT COMPRESSOR STATION | 2017 |
|
RU2653630C1 |
BLOWDOWN METHOD OF GAS PIPELINE SECTION AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2741178C2 |
METHOD FOR DISPLACING A GAS-AIR MIXTURE THROUGH GAS SAMPLING RISERS AND A DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2796731C1 |
METHOD OF FILLING VEHICLE WITH NATURAL GAS AND MOVABLE GAS FILLING STATION | 2006 |
|
RU2305224C2 |
INTRATUBAL DEVICE START-UP CONTROL SYSTEM | 2022 |
|
RU2791800C1 |
BYPASS AND PULSE PIPINGS OF LINE VALVES INCLUDED IN VALVE ASSEMBLIES OF MULTI-LINE MAIN GAS LINES LAID IN ONE PROCESS CORRIDOR | 2021 |
|
RU2777810C1 |
GAS DISTRIBUTION STATION OPERATION METHOD | 2020 |
|
RU2752119C1 |
HEAT AND WATER SUPPLY SYSTEM OF COMPRESSOR STATION | 2016 |
|
RU2686249C2 |
Authors
Dates
2019-03-26—Published
2018-05-07—Filed