FIELD: pipelines.
SUBSTANCE: invention relates to the field of operation of main gas lines and can be used for safe implementation of pre-repair (emptying) and pre-launch (filling sections of main gas lines with natural gas) operations, as well as for creating backup pulse gas supply for drives of line, bypass and vent valves included in the valve assemblies when there is possibility of violation of integrity of multi-line main gas lines laid in one process corridor. Bypass and pulse pipings of line valves as part of valve assemblies of multi-line main gas lines laid in one process corridor include bypass and vent gas lines with bypass and vent valves, as well as pulse pipings consisting of: pulse gas collection risers with discharge valves, pulse gas backup supply containers with inlet and outlet gas lines, shutoff valves, and pressure gauges, gas lines of the pulse piping circuits with shutoff and vent valves, vent lines, and check valves, pressure gauges, control and instrumentation sensor cabinets, filters, electropneumatic control units for the pneumatic hydraulic drives of line, bypass, and vent valves included in the valve assemblies of multi-line main gas lines. Switching assemblies are therein mounted on bypass pipings between the bypass and vent valves, said assemblies consisting of bypass gas lines with bypass valves and adjustment valves; switching assemblies are mounted in pulse pipings between the pulse gas collection risers, said assemblies consisting of bypass gas lines with bypass valves and adjustment valves, bypass gas lines with bypass valves are mounted between the bypass piping gas lines and inlet gas lines in the pulse gas backup supply container, a bypass gas line with bypass valve is mounted between the outlet gas lines from the backup pulse gas supply containers.
EFFECT: compensates for the temperature imbalance occurring in valve assemblies when sections of main gas lines are emptied (sudden cooling in the vent line and vent valve area) or filled (sudden heating in the area of pulse gas collection risers) with natural gas.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCTION OF NATURAL GAS FROM ADJACENT TO COMPRESSOR STATION SECTIONS OF MAIN GAS LINE BEFORE THEIR OUTPUT FOR REPAIR | 2019 |
|
RU2710106C1 |
METHOD FOR DISPLACING A GAS-AIR MIXTURE THROUGH GAS SAMPLING RISERS AND A DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2796731C1 |
METHOD FOR DISPLACEMENT OF TEMPORARY SEALING DEVICES DURING OPERATION OF MAIN GAS PIPELINES IN MULTI-THREAD DESIGN | 2019 |
|
RU2728112C1 |
METHOD OF SELECTION OF NATURAL GAS FROM DISCONNECTED MAIN GAS PIPELINE IN MULTILINE SYSTEM (VARIANTS) AND SYSTEM FOR CARRYING IT OUT | 2016 |
|
RU2619669C1 |
BLOWDOWN METHOD OF GAS PIPELINE SECTION AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2741178C2 |
METHOD OF SELECTING GAS OF STARTING, FUEL, PULSE AND FOR INTERNAL REQUIREMENTS FROM TECHNOLOGICAL COMMUNICATIONS OF COMPRESSOR SCHEMES OF COMPRESSOR STATION AS FUEL FOR DISARMING THE RELATED MACHINE TO REPAIR | 2016 |
|
RU2641770C2 |
METHOD FOR PUMPING NATURAL GAS OUT OF A DISCONNECTED GAS PIPELINE SECTION | 2022 |
|
RU2785793C1 |
BYPASS CONNECTION OF CRANES ON MAIN GAS PIPELINES, USED TO PREVENT CATASTROPHIC DEVELOPMENT OF EMERGENCY SITUATION IN CASE OF INTEGRITY FAILURE OF MAIN GAS LINE TO PROVIDE CRANE WITH PULSE GAS IN EMERGENCY SITUATIONS AND FOR ITS USE AS PULSED GAS ACCUMULATOR | 2018 |
|
RU2714466C2 |
THE METHOD FOR PUMPING GAS FROM THE DISCONNECTED SECTION OF THE CORRIDOR OF THE MAIN GAS PIPELINES | 2022 |
|
RU2787080C1 |
METHOD OF IMPULSE PIPING OF PIPELINE VALVES ON CRANE ASSEMBLIES LOCATED IN WETLAND CONDITIONS AND MOVING SOIL | 2018 |
|
RU2693956C1 |
Authors
Dates
2022-08-10—Published
2021-04-30—Filed