FIELD: construction.
SUBSTANCE: invention relates to underground construction and can be used in need of abutting approach tunnel to operating station of underground deep without side platforms. Upper transverse abutment of approach tunnel to existing metro station, constructed without interruption of operation of station with middle and side tunnels, made of prefabricated tubing, and including approach tunnel arranged above side tunnels, and transverse chamber with arch and walls. Adjunction is made within passenger area of existing metro station without side platforms and is equipped with reinforcement elements of station central tunnel, which include rigidly interconnected reinforced concrete foundation plate, monolithic columns and support plate, wherein support plate has hinged resting against walls of prefabricated cast iron elements located between middle and side tunnels, as well as monolithic arches rigidly connected to the support plate and tightly adjacent to the roof of the station central tunnel, providing spatial stiffness of the structure of the tunnel central tunnel and serving to support the arch and walls of the transverse chamber.
EFFECT: technical result consists in improvement of efficiency of construction works and reliability of design of upper transverse contiguity of approach tunnel to existing metro station without side platforms within passenger station zone.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CREATING UPPER CROSS-CUT ABUTTING JOINT OF APPROACH TUNNEL TO EXISTING METROPOLITAN PILOT STATION CONSTRUCTED WITHOUT INTERRUPTION OF STATION OPERATION | 2020 |
|
RU2745310C1 |
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) | 2012 |
|
RU2510444C2 |
METHOD FOR CONSTRUCTION OF COLUMN-TYPE TWO-VANE SUBWAY STATION BY CLOSED METHOD OF PERFOMING WORKS | 2019 |
|
RU2704415C1 |
DOUBLE-VAULTED PYLON SUBWAY STATION, CONSTRUCTED BY TRENCHLESS METHOD | 2019 |
|
RU2735506C1 |
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL | 2018 |
|
RU2692518C1 |
DOUBLE-LEVEL SINGLE-VAULT TRANSFER STATION UNIT OF DEEP SUBWAY | 1996 |
|
RU2131960C1 |
THREE-ARCH UNDERGROUND STATION OF THE CLOSED COLUMN-TYPE | 2022 |
|
RU2802893C1 |
COLUMNED TRIPLE-ARCHED SUBWAY STATION WITHOUT SIDE PLATFORMS | 2009 |
|
RU2410495C1 |
METHOD OF CONSTRUCTING SUBWAY PYLON STATION USING CLOSED METHOD OF PERFORMING WORKS ON OPERATING SUBWAY LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2824544C1 |
SINGLE-VAULT DEEP UNDERGROUND STATION WITH SUPPORTING TUNNELS, CONSTRUCTED BY A CLOSED METHOD FOR WORK | 2022 |
|
RU2785300C1 |
Authors
Dates
2020-03-20—Published
2019-07-29—Filed