FIELD: rail vehicles.
SUBSTANCE: invention relates to the field of railway equipment. Method of separate long-term storage of set of floating railway bridge NZhM-56 consists in the fact that at the manufacturer one time, according to the number of proposed guidance points of the built-in railway bridge NZhM-56, transition and coastal parts are made, which are contained in long-term storage near each of the places of proposed guidance of the bridge, and on the basis of long-term storage only elements of the river part of the floating bridge are contained. To keep elements of transition part and coastal span on long-term storage there is a level platform, at the same time in the middle of equipped platform from the ground there is an elevation, on which six sections of railway span of floating bridge are installed on row on wooden pads, next to each other. Outside elevation on one and on its other side there are three similar sections of railway span of floating bridge. Two other sections of the floating span of the floating bridge are installed perpendicular to the central section of the railway surfacing structure of the floating bridge and adjoin sides, intended for connection with other sections of railway span floating bridge during assembly of bridge, to sides of central section of railway span. On installed sections of railway span floating bridge are installed upside down through wooden pads of pantone section in such a way that one end of each pontoon section is located on sections of floating bridge structure of floating bridge installed on the elevation, and the other one - on sections outside the elevation.
EFFECT: invention provides, as compared to the method used, faster delivery of elements of this bridge to the point of guidance of the floating railway bridge, significantly reduces labour costs for transportation of bridge elements to the point of bridge guidance and thus enables to reduce the lead time of surfaced railway bridge NZhM-56.
1 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DOCKING OF RIVER PARTS OF FLOATING BRIDGES MLZH-VF-VT AND NZHM-56 | 2018 |
|
RU2692363C1 |
METHOD FOR JOINING COASTAL AND RIVER PARTS OF FLOATING UNIFIED RAILWAY RIBBON BRIDGE MLZH-VF-VT | 2020 |
|
RU2750370C1 |
METHOD FOR COMPENSATING FOR TEMPERATURE CHANGES IN THE LENGTH OF THE NzHm-56 FLOATING RAILWAY BRIDGE DURING THE WITHDRAWAL AND INPUT OF THE OUTLET FERRY DURING THE PASSING THROUGH OF SHIPS | 2020 |
|
RU2745580C1 |
METHOD OF BANK COMPENSATION FOR INVENTORY SURFACING RAILWAY BRIDGE AT HIGH SPEED OF RIVER FLOW | 2020 |
|
RU2739543C1 |
GROUND METHOD FOR ASSEMBLING BRIDGE FERRIES OF FLOATING RAILWAY BRIDGE | 2021 |
|
RU2819230C2 |
FLOATING ROAD BRIDGE | 2023 |
|
RU2825359C1 |
FLOATING RAILWAY BRIDGE | 2021 |
|
RU2755794C1 |
METHOD FOR CREATION OF RIVER PART OF CONTINUOUS FLOATING RAILWAY BRIDGE | 2018 |
|
RU2716629C1 |
METHOD OF BUILDING FLOATING BRIDGE AT FREEZING UP | 2002 |
|
RU2232224C1 |
METHOD OF SEPARATE LONG-TERM STORAGE OF METALLIC DEMOUNTABLE RAM-500 RAMP | 2019 |
|
RU2724207C1 |
Authors
Dates
2020-10-21—Published
2019-10-21—Filed