FIELD: construction of tunnels.
SUBSTANCE: invention relates to the field of tunnel construction, in particular, to construction of single-vault metro stations built by a closed method for work performance, primarily deep-laid. A single-vault metro station with cast reinforced concrete lining, built by a closed method for work performance, having a box shape in the cross-section and consisting of an upper vault, a reverse vault, and walls, located wherein are rail track structures and an island passenger platform with maintenance and technical rooms located under said platform. The lining of the station consists of two layers, wherein each layer is made of cast reinforced concrete. The first layer of the lining is constructed in accordance with the technology of sprayed concrete with anchors, and the second layer is constructed using formwork, a waterproofing layer is placed between the layers of the lining. The lining has a raised upper vault allowing for placement of maintenance and technical rooms above the passenger platform and the rail tracks.
EFFECT: ensured rational contour of the lining, increased speed and manufacturability of construction, and improved safety of construction and reliability of operation of the metro station.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SHALLOW LYING SINGLE-VAULT METRO STATION, CONSTRUCTED BY A CLOSED METHOD FOR WORK, WITH A LINING MADE OF MONOLITHIC REINFORCED CONCRETE | 2021 |
|
RU2771803C1 |
SINGLE-VAULT DEEP UNDERGROUND STATION WITH SUPPORTING TUNNELS, CONSTRUCTED BY A CLOSED METHOD FOR WORK | 2022 |
|
RU2785300C1 |
SINGLE-ARCH UNDERGROUND STATION CONSTRUCTED USING TUNNELING WITH SIDE PASSENGER PLATFORMS | 2022 |
|
RU2795011C1 |
SINGLE-VAULT MULTILEVEL SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (P.B. YURKEVICH'S DESIGN) | 2014 |
|
RU2562359C2 |
METHOD OF CONSTRUCTING DEEP UNDERGROUND STATION ON OPERATING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2825811C1 |
THREE-ARCHED UNDERGROUND STATION OF THE CLOSED METHOD FOR THE PYLON-TYPE WORKS PERFORMANCE | 2022 |
|
RU2795446C1 |
THREE-ARCH UNDERGROUND STATION OF THE CLOSED COLUMN-TYPE | 2022 |
|
RU2802893C1 |
DOUBLE-VAULTED PYLON SUBWAY STATION, CONSTRUCTED BY TRENCHLESS METHOD | 2019 |
|
RU2735506C1 |
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) | 2012 |
|
RU2510444C2 |
METHOD FOR ERECTION OF THREE-VAULT SUBWAY STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2020 |
|
RU2729474C1 |
Authors
Dates
2021-11-02—Published
2021-02-25—Filed