FIELD: railroad automation and telemechanics.
SUBSTANCE: invention relates to methods for controlling the reliability of railroad automation and telemechanics systems for newly designed stations in the absence of statistical data on their functioning, as well as when upgrading the railroad automation and telemechanics systems by varying the initial data. The method uses a server that has a database with source data, a calculation module, a visualization module for source and calculation data, while information about the types and number of elements of the railroad automation and telemechanics system is used as source data, and a reference switching control system is used as a reference object, then the reference switching control system reference object failure rate is calculated using the calculation module for reference and actual operating conditions using a system of correction coefficients, which includes the equipment coefficient, the load factor of the area and the climatic coefficient. After that, the values of the failure rate of the railroad automation and telemechanics system are calculated in actual operating conditions, taking into account the time until the operability of the railroad automation and telemechanics equipment is restored. Next, the readiness coefficient of the railroad automation and telemechanics systems is calculated and information is output using the visualization module of the initial and calculated data. At the same time, a single-line plan of stations is also used as initial data used to determine the layout of the reference object replacing the corresponding elements of the railroad automation and telemechanics system.
EFFECT: present invention enables to increase the accuracy of calculations of the availability coefficient of the railroad automation and telemechanics systems.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR IMPROVING RELIABILITY OF RAILROAD AUTOMATION AND TELEMECHANICS SYSTEMS WITH EVALUATION OF EFFICIENCY THEREOF | 2019 |
|
RU2725354C1 |
METHOD AND APPARATUS FOR REGISTRATION OF RESOURCE EXHAUSTION OF RAILROAD AUTOMATIC AND TELEMETRY EQUIPMENT | 2020 |
|
RU2753855C1 |
AUTOMATED SYSTEMS FOR INTEGRATED MANAGEMENT OF RESOURCES, RISK, RELIABILITY OF RAILWAY TRANSPORT | 2015 |
|
RU2579981C1 |
MULTILEVEL CONTROL SYSTEM TO PROVIDE TRAIN TRAFFIC SAFETY AT MAJOR RAILWAY STATIONS | 2009 |
|
RU2403162C1 |
METHOD OF SIMULATION OF EMERGENCY RESPONSE ACTIVITIES AT AUTOMATICS AND TELEMECHANICS FACILITIES | 2013 |
|
RU2531780C2 |
METHOD FOR MEASURING TRAIN SHUNT RESISTANCE WITH CENTRALIZED PLACEMENT OF RAIL CIRCUIT EQUIPMENT AND DEVICE FOR ITS IMPLEMENTATION | 2020 |
|
RU2748742C1 |
METHOD OF MANAGEMENT OF THE QUALITY OF THE TRANSPORT PROCESS ON RAILWAY TRANSPORT | 2016 |
|
RU2622523C1 |
TRAIN CONTROL SYSTEM AND TRAIN SEPARATION METHOD IMPLEMENTED IN IT | 2014 |
|
RU2572278C1 |
SYSTEM OF MICROPROCESSOR CENTRALIZATION OF ARROWS AND SIGNALS MPTS-I | 2023 |
|
RU2794389C1 |
METHOD OF PUMP STATION RELIABILITY EVALUATION | 2015 |
|
RU2602295C1 |
Authors
Dates
2022-12-26—Published
2022-08-16—Filed